Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and paving for a road / highway in Smiths Grove, Kentucky. Conceptual plans call for site work for a road / highway; and for paving for a road / highway.
This document constitutes a Request for Proposals for a Professional Service Contract from qualified individuals and organizations to furnish those services as described herein for the Commonwealth of Kentucky, Department of Highways. County - Warren Route - KY-101 Item No. - 3-80214.00 Project Description - Construct a two-lane roundabout at the intersection of KY-101 and the I-65 Southbound entrance and exit ramps in Smiths Grove. Widen the existing I-65 Southbound exit ramp to two lanes and extend the beginning point if the ramp approximately five-hundred to onethousand feet north. Widen approximately five hundred feet of existing KY-101 from the new roundabout north towards Smiths Grove if required by design. Project Manager - Robin Sprague, P.E. User Division - Highway Design Approximate Fee - $525,000 Preliminary Engineering & Environmental Services (Lump Sum) Project Funding - SLX & SS4A (Federal Funds) Project Length - Approximately 1.4 miles The Consultant team may include a DBE Participation Plan with their full Response to Announcement to help the Department meet the 11.95% DBE goal established by FHWA. Project Manager - Stewart Lich, P.E. User Division - Highway Design Approximate Fee - $450,000 Preliminary Engineering & Environmental Services (Lump Sum) Project Funding - STP2 & SPP (Federal & State Funds) Project Length - Approximately 0.65 miles First Selection Meeting: April 8, 2024 Final Selection: April 24, 2024 Pre-Design Conference: May 1, 2024 Consultant Fee Proposal: May 10, 2024 Contract Negotiations: May 22, 2024 Notice to Proceed: June 12, 2024 The method of contractor selection has not been determined at this time. KYDOT - RFP Engineering - Construct a Two-Lane Roundabout at the Intersection of KY-101
Conceptual
Roads / Highways
$450,000.00
Public - State/Provincial
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 3, 2025
KY-101, Smiths Grove, KY
Related To This Project
Smiths Grove, KY
Bid Date: Jun 20 2024
Smiths Grove, KY
--
Smiths Grove, KY
Bid Date: Sep 15 2020
Smiths Grove, KY
Bid Date: Aug 24 2023
Smiths Grove, KY
Bid Date: May 25 2023
Smiths Grove, KY
Bid Date: Mar 23 2023
Smiths Grove, KY
Bid Date: Feb 03 2023
Smiths Grove, KY
--
Smiths Grove, KY
Bid Date: Jul 21 2022
Smiths Grove, KY
Bid Date: Apr 28 2022
Lexington, KY
--
Anchorage, KY
Bid Date: Mar 20 2024
West Liberty, KY
Bid Date: Mar 14 2024
Louisville, KY
Bid Date: Mar 28 2024
Louisville, KY
Bid Date: Mar 27 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.