BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a road / highway in Half Moon Bay, California. Completed plans call for site work for a road / highway; and for paving for a road / highway.

As of April 23, 2024, this project has been awarded to Andreini Bros., Inc with the awarded amount of $425,579.60. In general, this project includes pavement maintenance, such as mill and fill, base repair, thermoplastic striping, and other miscellaneous items. Project limits include Alsace Lorraine Avenue between Central Avenue to Granelli Avenue, Third Avenue from Central Avenue to Filbert Street, Second Avenue from Grove Street to Magnolia Street, and other various locations within Half Moon Bay jurisdiction specifically for base repairs. First Avenue between Metzgar Street and Grove Street as well as Third Avenue between Metzgar Street and Grove Street are considered as the bid additive. The work is to be complete within a period of 40 working days, unless otherwise agreed upon after issuance of the Notice to Proceed. The City of Half Moon Bay is requesting for the project to be completed prior to June 30, 2024. A Notice to Proceed will be issued once all insurance, bonds, and critical submittals have been approved. If the Contractor fails to complete the work within the above specified time limit, the Contractor shall pay liquidated damages to the City, computed at the rate of Five Hundred Dollars ($500) for each calendar day beyond the specified time limit until the project is completed. Question Deadline 03/26/2024 at 5:00 PM PT Requests for information on receiving bid packages or questions concerning the project should be directed to Project Manager/Engineer, Jonathan Woo, Assistant Engineer at the City Hall, 501 Main Street, by phone: (650) 726-7177, Fax: (650) 726-8261 or e-mail: jwoo@hmbcity.com. You may view the plans and bid package at the Barker Blue website through online. The Engineer's Estimate for the base bid of the project is $505,081.90, and $147,145.90 for the bid additive. All bids must include a bidder's bond or certified check for at least ten (10) percent of the total bid price including any additive items. Bonds or securities assuring faithful performance and payment for labor and materials in an amount of at least one hundred (100) percent of the contract amount, and insurance policies as required by the contract documents shall be furnished to the City upon execution of the contract. Pursuant to Califonia Business and Professions Code section 7059, the Contractor, at the time of bid submittal, must have the State of California General Contractor's license, Class A, combination of appropriate licenses required to perform the entire work. Subcontractors shall also be properly licensed to perform specified work. The minimum percentage of work that is required to be completed by the General/Prime Contractor is thirty (30) percent. The City reserves the right to reject any and all bids and/or to waive any bid irregularity to the extent permitted by law. If the City elects to award a contract for performance of the project, the contract will be to the lowest responsible bidder. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Award

Roads / Highways

$425,580.00

Public - City

Paving, Site Work

16

9

5

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
130
Active Projects
78
Bidding Soon
1,608
All Active Projects
676
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 2, 2024

May 2, 2024

img_map_placeholder

Multiple Locations, Half Moon Bay, CA


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.