Find the next project before your competition does.

See pricing

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published March 15, 2024 at 8:00 PM

Updated March 22, 2024

This is a service / maintenance or supply contract in Regina, Saskatchewan. Contact the soliciting agency for additional information.

Reference Number 0000266239 Question Acceptance Deadline Mar 18, 2024 02:00 PM CDT Pricing Lump sum Work of this Contract involves the renovation of the Veterans Affairs Canada (VAC) reception area in the Alvin Hamilton Building, located at 1783 Hamilton Street, Regina, Saskatchewan. 1 Work of this Contract involves the supply of materials for a renovation of the reception area in the Alvin Hamilton Building, located at 1783 Hamilton Street, Regina, Saskatchewan. For the purpose of this contract the owner will be represented by the Project Manager appointed by BGIS who will fulfill the role defined for the BGIS Representative in these specifications. 2 The work includes but not limited to: 1.Supply only of ballistic fiberglass panels as per the specifications. 2 Supply only of ballistic glazing as per the specifications and Appendix A. 3 Provide manufacturer's information and shop drawings. 4 Provide operation and maintenance documentation from supplier to include in the O&M manual A bid bond in a commercially reasonable form or an irrevocable standby letter of credit issued by a financial institution authorized to conduct business in Canada as a Schedule I or Schedule II chartered bank in the amount of at least 10% of the Bid Price and that shall be in effect until forty-five (45) calendar days following Closing Date. A suretys consent indicating that, in accordance with section 5.18.1. of this ITT, the surety company will furnish the contract security which shall include a 50% performance bond and a 50% labour and materials payment bond of the Bid Price or a consent from the Schedule I or Schedule II chartered bank that an irrevocable standby letter of credit in the amount of 50% of the Bid Price will be furnished. Official bid documents must be obtained from www.bgis.merx.com and bid submissions must be done through the Merx platform.

Post-Bid

Municipal

Public - Federal

Service, Maintenance and Supply

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
46
Active Projects
13
Bidding Soon
208
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 21, 2024

April 22, 2024

Project location map

1783 Hamilton St, Regina, SK

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed