Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work for a water / sewer project in Rudd, Iowa. Completed plans call for site work for a water / sewer project.
The extent of work on this project is the furnishing of all labor, equipment, and materials for the construction of improvements in Rudd, Iowa, generally described as follows: 1. Contract I - Water Tower (Chickasaw Street between 3rd Street and 4th Street) a. Rehabilitation of 150,000-gallon pedestal type water tower. b. All modifications shown on the Drawings. c. All modifications listed in the Specifications. 2. Contract II - Water Meters (installed City-wide) a. Replacement of all water meters in system. b. Provide AMR reading system software and hardware. 3. Contract III - Raw Water Main (installed 3rd Street and Swartwood Street) a. Installation of 6" raw water main. b. Installation of conduit and wire for well control. c. WTP modifications and appurtenances. d. Restoration Work includes, but is not limited to, to the construction of site work, electrical/mechanical work associated with the improvements, as well as start-up services and restoration. On April 9, 2024, at 7:00 p.m., at Rudd City Hall, the City Council of the City of Rudd shall consider the construction bids received and either award a contract, reject all bids, or adjourn action thereon to a subsequent meeting of the City Council. The Work will be commenced upon issuance of a Notice to Proceed unless listed otherwise below, and shall be substantially completed on or before the dates noted below and completed and ready for final payment in accordance with Paragraph 15.06 of the General Conditions on or before the dates listed below: Contract I - Water Tower Early Contract Commencement Date July 22, 2024 (Mobilize, hydro tank setup, and testing, etc.) Project shall commence on August 1, 2024 (Water tower taken offline) Substantial Completion 60 calendar days Final Completion 90 calendar days Contract II - Water Meters Substantial Completion October 30, 2024 Final Completion November 30, 2024 Contract III - Raw Water Main Substantial Completion October 30, 2024 Final Completion November 30, 2024 Substantial completion is defined as follows: All work is complete except for finish grading of turf restoration areas, seeding and minor clean up. The contract times noted are subject to any extension which may be granted by the City Council of Rudd, Iowa. Davis-Bacon and Related Acts and federal prevailing wage rates apply to this project. All provisions relative to those acts must be met. Each bid must be made out on a Bid Form furnished in the Project Manual and obtained from SEH or on a computerized Bid Form furnished by the bidder. Bid Forms furnished by the bidder shall replicate the Bid Form furnished in the Project Documents Manual. Each bid shall be sealed in an envelope marked "Bid for the 2023 Water System Improvements Project". Each bid must be accompanied in a separate envelope by a bidding check or bid bond in an amount equal to five percent (5%) percent of the bid price, said check being either a certified or cashier's check, drawn on a bank in Iowa, or a bank chartered under the laws of the United States, or a Certified share draft drawn on a credit union in Iowa or chartered under the laws of the United States, and made payable to the City of Rudd, Iowa, as security that the bidder will furnish the required bonds and enter into a contract within ten (10) working days, excluding Saturday, Sunday, and holidays, after the award of the contract to him. Bidders shall not be permitted to withdraw their bids for a period of forty five (45) days after the same are opened. By virtue of statutory authority, a preference will be given to products and provisions grown and coal produced within the State of Iowa and to Iowa domestic labor. To the extent required by Iowa law, a resident bidder shall be allowed a preference as against a nonresident bidder from a state or foreign country if that state or foreign country gives or requires any preference to bidders from that state or foreign country, including but not limited to any preference to bidders, the imposition of any type of labor force preference or any other form of preferential treatment to bidders or laborers from that state or foreign country. The preference allowed shall be equal to the preference given or required by the state or foreign country in which the nonresident bidder is a resident. In the instance of a resident labor force preference, a nonresident bidder shall apply the same resident labor force preference to a public improvement in this state as would be required in the construction of a public improvement by the state or foreign country in which the nonresident bidder is a resident. Failure to submit a fully completed Bidder Status Form with the Proposal may result in the Proposal being deemed nonresponsive and rejected. Bidders shall be expected to comply with Chapters 91C and 103A of the Code of Iowa concerning the registration and bonding of construction contractors and the successful bidder shall be required to supply the City of Rudd with proof of said compliance. Payment for said "2023 Water System Improvements Project," will be made from Community Development Block Grant (CDBG) funds, a State Revolving Fund Loan and the General Funds of the City of Rudd, or from such other funds as may be legally used for such purposes. Monthly estimates will be submitted to the Engineer and payment will be made to the Contractor in the amount of ninety-five percent (95%) of said estimate on or about the twentieth of the following month. Final payment will be made not sooner than thirty (30) days following final acceptance of the work by the City of Rudd. The bidder's attention is called to the prompt payment to the subcontractors under Chapter 573.12 of the Code of Iowa. Copies of said plans and specifications, forms of contract and cost estimate are now on file in the office of the City Clerk, for examination by bidders. The City encourages bids from qualified minority and female contractors. All bids shall NOT include Iowa Sales Tax for materials used in the project. Upon award, the successful bidder shall immediately provide a listing of subcontractors and associated Federal ID or Social Security Numbers for both the contractor and subcontractors. The City will register the contractor and subcontractors with the Iowa Department of Revenue and will provide appropriate certificates to the contractor for distribution and use. A. The work to be performed under this contract is subject to the requirements of Section 3 of the Housing and Urban Development Act of 1968, as amended, 12 U.S.C. 1701u (Section 3). The purpose of Section 3 is to ensure that employment and other economic opportunities generated by HUD assistance or HUD-assisted projects covered by Section 3, shall, to the greatest extent feasible, be directed to low- and very low-income persons, particularly persons who are recipients of HUD assistance for housing. B. The parties to this contract agree to comply with HUD's regulations in 24 CFR part 75, which implement Section 3. As evidenced by their execution of this contract, the parties to this contract certify that they are under no contractual or other impediment that would prevent them from complying with the part 75 regulations. C. The contractor agrees to post copies of a notice advising workers of the Contractor's commitments under Section 3 in conspicuous places at the work site where both employees and applicants for training and employment positions can see the notice. The notice shall describe the Section 3 preference, shall set forth minimum number and job titles subject to hire, availability of apprenticeship and training positions, the qualifications for each; and the name and location of the person(s) taking applications for each of the positions; and the anticipated date the work shall begin. D. The contractor agrees to provide written notice of employment and contracting opportunities to all known Section 3 Workers and Section 3 Businesses. E. The contractor agrees to employ, to the greatest extent feasible, Section 3 workers or provide written justification to the recipient that is consistent with 24 CFR Part 75, describing why it was unable to meet minimum numerical Section 3 worker hours goals, despite its efforts to comply with the provisions of this clause. F. The contractor agrees to maintain records documenting Section 3 Workers that were hired to work on previous Section 3 covered projects or activities that were retained by the contractor for subsequent Section 3 covered projects or activities. G. The contractor agrees to post contract and job opportunities to the Opportunity Portal and will check the Business Registry for businesses located in the project area. H. The contractor agrees to include compliance with Section 3 requirements in every subcontract for Section 3 projects as defined in 24 CFR part 75, and agrees to take appropriate action, as provided in an applicable provision of the subcontract upon a finding that the subcontractor is in violation of the regulations in 24 CFR part 75. The contractor will not subcontract with any subcontractor where the contractor has notice or knowledge that the subcontractor has been found in violation of the regulations in 24 CFR part 75. I. The contractor will certify that any vacant employment positions, including training positions, that are filled (1) after the contractor is selected but before the contract is executed, and (2) with persons other than those to whom the regulations of 24 CFR part 75 require employment opportunities to be directed, were not filled to circumvent the contractor's obligations under 24 CFR part 75. J. The contractor will certify that they have followed prioritization of effort in 24 CFR part 75.19 for all employment and training opportunities. The contractor will further certify that it meets or exceeds the applicable Section 3 benchmarks, defined in 24 CFR Part 75.23, and if not, shall describe in detail the qualitative efforts it has taken to pursue low- and very low-income persons for economic opportunities. K. Noncompliance with HUD's regulations in 24 CFR part 75 may result in sanctions, termination of this contract for default, and debarment or suspension from future HUD assisted contracts. Bids shall be directed to the City Clerk, securely sealed and endorsed upon the outside wrapper, "Bid for 2023 WATER SYSTEM IMPROVEMENTS PROJECT." The City of Rudd reserves the right to reject any and all Bids, to waive irregularities and informalities therein and to award the Contracts in the best interests of the City of Rudd. Question Deadline 04/02/2024 All questions about the meaning or intent of the Bidding Documents are to be submitted to Engineer in writing. Interpretations or clarifications considered necessary by Engineer in response to such questions will be issued by Addenda delivered to all parties recorded as having received the Bidding Documents. Questions received less than 5 days prior to the date for opening of Bids may not be answered
Award
Water / Sewer
$500,000.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 17, 2024
August 5, 2024
Multiple Locations, Rudd, IA
Related To This Project
Rudd, IA
--
Rudd, IA
Bid Date: Jan 20 2021
Rudd, IA
Bid Date: Jul 21 2020
Rudd, IA
Bid Date: Dec 21 2021
Rudd, IA
Bid Date: Apr 24 2023
Rudd, IA
Bid Date: Feb 16 2021
Rudd, IA
Bid Date: Oct 07 2020
Grinnell, IA
Bid Date: Apr 09 2024
Decorah, IA
Bid Date: Mar 15 2024
Tama, IA
Bid Date: Apr 23 2024
Watkins, IA
Bid Date: Apr 04 2024
Murray, IA
Bid Date: Mar 15 2024
Davenport, IA
Bid Date: Apr 17 2024
Clinton, IA
Bid Date: Apr 02 2024
Waterloo, IA
Bid Date: Apr 09 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.