BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Renovation of a mixed-use development in San Diego, California. Design plans call for the renovation of a swimming pool.

Sunshine Berardini Field / Sunshine Berardini Park Address drainage issues at the canyon entrance. Provide a lookout area for people with special needs. Provide trailheads and an information kiosk. Expand existing parking. Demolish the existing restroom and replace it with two new restrooms. Relocate the east playground and parking lot. Install a new recreation area to the north of the existing parking lot. Construct new basketball courts and pickleball courts based on community input. On-street angled parking on Federal Boulevard. Install as-needed pedestrian and bicycle improvements to connect to adjacent active transportation projects. Incorporate existing baseball fields into a multi-purpose field. Construct a new pedestrian bridge that crosses Chollas Creek. Install sports lighting. Install a multi-purpose pathway along the northern edge of the park. Install permanent erosion control, including retaining walls, to stabilize steep slopes to the north of the park. Provide a connection to the Oak Park Tributary Trail and Parks and Recreation Open Space. Install accessibility improvements within the park to comply with the Americans with Disabilities Act. Install new landscaping. The exact scope will be finalized during the GDP process through the community, council office and Parks and Recreation Department. As of March 13, 2024, this project is part of the nineteen parks across the City of San Diego that were awarded $16 million for renovations, upgrades and improvements from a new citywide developer fee fund. The city hired a design consultant in May 2023. Information regarding a design team is not available. A timeline for construction has not been determined. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Design

Swimming Pools

$1,000,000.00

Public - City

Renovation

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
70
Active Projects
27
Bidding Soon
713
All Active Projects
328
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 13, 2025

img_map_placeholder

4416 Federal Blvd, San Diego, CA


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.