BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work, new construction and renovation of a mixed-use development in Fort Plain, New York. Completed plans call for the demolition of a parking garage; for site work for a 9,229-square-foot parking garage; for the renovation of a pre-engineered storage facility; pre-engineered storage facility; and for the construction of a pre-engineered storage facility.

Construction of a new highway garage within the general area of the previous highway garage at the above referenced site. Work includes limited demolition of existing garage foundations and floor slab, limited site & utility related work, new pre-engineered metal building, foundations, mechanical, electrical, plumbing, fire alarm and fire protection system. The Project schedule anticipates an approximate contract award and start date of one (1) month from bid opening and shall be Substantially Completed by November 22, 2024 for Owner Occupancy and completed and ready for final payment by December 23, 2024. The Contractor(s)' surety, if any, shall be assessed liquidated damages for late completion. The labor on this contract s hall be performed in all respects in full accordance with the Labor Law of the State of New York. Contractors must conform to the New York State prevailing wage rate schedules which are annexed to and form a part of the specifications for this project. Bid security in the amount of 5% of the Bid must accompany each Bid in accordance with the Instructions to Bidders. The successful Bidder will be required to furnish a performance bond and a payment bond, each in an amount equal to 100% of the contract price. The Town of Minden reserves the right to waive any informalities or irregularities in the Bids received, or to reject any or all Bids without explanation. Doc Notes: Only those Contract Documents obtained in this manner will enable a prospective bidder to be identified as an official plan holder of record. Contract Documents obtained from other sources may not be accurate or may not contain addenda that may have been issued. Costs for sets of printed documents shall be the responsibility of the Bidder. If requested, documents will be sent by UPS Ground delivery at the non-refundable cost of $10.00 per set for postage and handling.

Bid Results

Parking Garage

$500,000.00

Public - City

Demolition, New Construction, Renovation, Site Work

85

29

16

5

Subscribe For Documents

25 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
127
Active Projects
58
Bidding Soon
925
All Active Projects
434
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 10, 2024

May 10, 2024

img_map_placeholder

134 NY-80, Fort Plain, NY


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.