Site work and paving for a road / highway in Ozark, Missouri. Completed plans call for site work for a road / highway; and for paving for a road / highway.

Questions Deadline: 3/19/2024 10:00 AM (CT) Christian County Invites Qualified Office Supply Vendors to Submit Responses for the Itb #2024-6 Striping Services - County Roadways, in Accordance With the Requirements Stated Herein. See Bid Specifications in Attachments Tab. Questions: Questions Should Be Submitted Online Through the Christian County Electronic Bidding Portal Before 10:00 a.m. March 19, 2024. Project Goal: the Christian County Commission is Accepting Bids for Striping Services - County Roadways. The Christian County Commission Reserves the Right to Refuse or Reject Any and All Bids and Waive Any Formality or Irregularity in Any Bid Received. The Commission Reserves the Right to Make Awards to Other Than the Low Bidder, or Multiple Bidders, if Such Award(S) is Deemed to Be in the County's Best Interest. Term: This Bid is for Six Projects Only. It Will Be Necessary to Work With the Highway Administrator on the Timeline for Completion of These Projects. Note: Christian County Reserves the Right to Make a Single or Multiple Awards for This Solicitation. All Contracts by the County Are Nonexclusive Contracts. Pricing: This Itb is for Six Projects Only. the Bidder Will Provide a Price for Each Project. You Will Enter Your Pricing Under the Line Items Tab. Note: Agreements Signed by Christian County Must Be Signed by at Least a Majority of the Members of the County Commission. Agreements Must Be Attested by the County Clerk and Approved to Form by the County Counselor. In Addition, the County Auditor Must Certify That There is an Unencumbered Balance Available to Pay the Contract Cost. Minimum and Maximum: There Are No Minimum or Maximum Quantities Guaranteed for This Contract. Multiple Awards: We Reserve the Right to Make a Single or Multiple Awards to This Bid. Idemnification: Indemnity Agreement: to the Fullest Extent Permitted by Law, Contractor Shall Indemnify, Hold Harmless and Defend the County, Its Directors, Officers, Agents, and Employees From and Against All Claims, Damages, Losses and Expenses (Including but Not Limited to Attorney's Fees) Arising by Reason of Any Act or Failure to Act, Negligent or Otherwise, of Contractor, of Any Subcontractor (Meaning Anyone, Including but Not Limited to Consultants Having a Contract With Contractor or a Subcontract for Part of the Services), of Anyone Directly or Indirectly Employed by Contractor or by Any Subcontractor, or of Anyone for Whose Acts the Contractor or Its Subcontractor May Be Liable, in Connection With Providing These Services. This Provision Does Not, However, Require Contractor to Indemnify, Hold Harmless, or Defend the County of Christian From Its Own Negligence. Terms and Conditions: View Under Attachments Tab. History: Christian County is a First-class County Without a Charter Form of Government. The Governing Body of Christian County is the County Commission. The Commission Consists of a Presiding Commissioner, a Western Commissioner, and an Eastern Commissioner. Its County Seat is Ozark, Missouri. The County Was Organized in 1959 and Continues to Be One of the Fastest-growing Counties in the State. Cities in Christian County Include Billings, Clever, Fremont Hills, Highlandville, Nixa, Ozark, Sparta and Village of Saddlebrooke. Contractor shall perform the following tasks at locations specified below and in Bid Table. - Provide striping in accordance with MoDOT EPG Category 620, all sub-categories, and meeting all other MoDOT requirements for pavement markings. - Contractor shall provide specifications to County for waterbourne paint and beads prior to start of work. Specifications must meet MoDOT requirements. - All equipment must be removed from the right-of-way by Contractor (no work zone shall be opened with equipment still in right of way) - All traffic control must be provided by Contractor and meet current specifications outlined in the Manual on Uniform traffic Control Devices (MUTCD) - Bid shall include any overhead, mobilization, operators, fuel and other expenses necessary for completion of project. - No striping shall be placed in MoDOT right of way.

Award

Roads / Highways

$42,200.00

Public - County

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
42
Active Projects
20
Bidding Soon
381
All Active Projects
151
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 5, 2024

May 7, 2024

img_map_placeholder

Multiple Locations, Ozark, MO

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.