Renovation of a detention facility in Appleton, Wisconsin. Completed plans call for the renovation of a detention facility.

Scope of Work Reference the "Justice Center Elevator Manual" dated 3/11/2024 for general specifications and scope for each elevator. Reference attachment "Existing Power Units" dated 3/11/2024 for photos and information on the existing power units for each elevator. Elevator components shall be non-proprietary in the sense that usual and typical elevator companies can service the elevators in the future. New power units and controls shall match speed, weight any other rating of current elevator and controls. Contractor shall also to the extent possible, match voltage and current rating of existing units, or to stay within the capacity of the existing building power supplies and disconnects to the elevators. Elevators #1, #2 and #5 are connected to emergency generator power. Contractor shall update new controls as needed so the elevator runs on generator power and meets all current codes relating to emergency power including any required notification lights. Elevator #5 is wired into the Jails Central Control officer's station in a manner that allows Central Control officers to monitor what floor the elevator is on as well as door status. These controls must remain or be wired into the new elevator controls as part of this project. See "Existing Power Units" document for pictures of the wiring diagram. Contractor shall provide the owner with a detailed work schedule at least 4 weeks prior to starting work. Tie in all existing key switches to existing controls. Outagamie County has the sole discretion and reserves the right to cancel this bid and to reject any and all bids received prior to award, to waive any or all informalities and or irregularities, or to re-advertise with either an identical or revised specification. Outagamie County reserves the right to request clarifications for any bid. the amount of five percent (5%) of your total bid price, payable to the owner as a guarantee that if the bid is accepted Cashier's or Certified Checks used as bid security will be returned to all except the successful bidder within ten (10) business days of the award to the successful bidder. Completion A contract will be issued by end of day April 10, 2024. The Contractor shall achieve substantial completion be by 3:00 pm CT March 28, 2025. Failure to achieve substantial completion by March 28th will result in a $100 per calendar day liquidated damages penalty. All requests for further information should be directed as follows: Site Information Paul Farrell Facilities Director Paul.Farrell@outagamie.org 920-832-1855 Bidding & Purchasing Information Nicole Schoultz Procurement Coordinator, Outagamie County (920) 832-6083 Nicole.Schoultz@outagamie.org Any questions that come up and require additional information will be posted online at www.outagamie.org then Bids / Proposals. Bid Results :: Elevator #1 :: Schindler :: $ 100,063.00 Elevator #2 :: Schindler :: $ 100,063.00 Elevator #5 :: Schindler :: $ 105,093.00 Elevator #7 :: Schindler :: $ 106,912.00

Bid Results

Jails / Prisons

$412,131.00

Public - County

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
50
Active Projects
31
Bidding Soon
367
All Active Projects
160
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 2, 2024

May 2, 2024

img_map_placeholder

320 S Walnut St, Appleton, WI

The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.