EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published March 19, 2024 at 8:00 PM

Updated October 1, 2024

Site work and paving for a mixed-use development in Fellsmere, Florida. Completed plans call for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; and water / sewer project.

Questions relating to definitions, interpretations, information and/or requests for clarification must be in writing, on or before April 7, 2024, at 5:00 P.M. (Local Time), directed to: Laura Hammer, Grant Administrator, City of Fellsmere at 772-646-6324 or grantadmin@cityoffellsmere.org. The goal of this project is to treat stormwater and provide additional flood mitigation for North South Alleys within the historic plat of Fellsmere, an approximate one square mile basin containing primarily residential single-family homes with no current treatment. The project is funded by two separate grants from the State of Florida: thus requiring separate work areas and billing. The existing drainage conveyance system of ditches and canals accepts stormwater runoff from the original one square mile of historic Fellsmere with no formal treatment prior to discharge to the Sebastian River and ultimately the Indian River Lagoon. The project entails design and construction of a swale stormwater management system for certain alleys within the original plat of Fellsmere. The priority alleys chosen contain no swale or an inadequate swale due to size and slope and can be seen on Figures 1 and 2 contained herein. If funding allows, additional priority alleys are shown in Figures 3 and 4. A typical alleyway design is shown in Figure 5. The proposed stormwater management system will include storage and treatment of stormwater runoff within the basin through a series of swales and piping for discharge to the Fellsmere Water Control District (FWCD) drainage conveyance system. As a retrofit, the treatment system does not have to meet SJRWMD standards for new construction and no permits are required. The project benefits the Indian River Lagoon by removing harmful pollutants such as sediment, nitrogen and phosphorus thus helping to attain and maintain water and sediment within the lagoon of sufficient quality to support a healthy estuarine ecosystem. By improving the water quality, the project will also help attain and maintain a functioning, healthy ecosystem which supports endangered and threatened species, fisheries, commerce, and recreation. The project also provides flood mitigation benefits.

Post-Bid

Sidewalks / Parking Lot

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

8

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, References, Definitions, Temporary Facilities and Controls, Temporary Controls, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Closeout Submittals, Project Record Documents
Division 03 - Concrete

Division 03 - Concrete

Concrete Reinforcing, Precast Concrete
Division 05 - Metals

Division 05 - Metals

Metal Fabrications, Metal Gratings
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Wood, Plastics, and Composites, Common Work Results for Wood, Plastics, and Composites, Rough Carpentry, Sheathing, Underlayment
Division 08 - Openings

Division 08 - Openings

Glazing, Glass Glazing
Division 09 - Finishes

Division 09 - Finishes

Painting and Coating
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Lifts
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Fine Grading, Excavation and Fill, Excavation, Dewatering, Fill, Backfill, Compaction, Shoring and Underpinning, Shoring, Sheet Piling
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Curbs and Gutters, Paving Specialties, Pavement Markings, Planting, Turf and Grasses, Sodding, Plants, Trees
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Lifting Devices, Lifts
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
133
Active Projects
76
Bidding Soon
1,162
All Active Projects
469
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 23, 2024

August 23, 2024

img_map_placeholder

Multiple Locations, Fellsmere, FL


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

RFP D/B - Alleyway Grading Project

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.