BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Farmington, New Mexico. Working plans call for site work for a water / sewer project.

The work to be performed under this contract shall consist of furnishing all labor, equipment, and materials to perform various construction, alterations, repairs, and replacement of municipal sanitary sewer manholes and appurtenances and other incidental work. Question Deadline: 4/8/2024 04:00 PM (MT) Questions and/or clarifications concerning this solicitation must be entered into the Questions tab in the online bidding system through online The total bid for each Bid Schedule includes all work necessary to complete that portion of the project described in each Bid Schedule, and the total of all Bid Schedules represents the entire scope of work covered by the Contract Documents. If a particular item of work is not specifically separated as a bid item, the cost therefore shall be included in the bid item most nearly related. If awarded a contract, the undersigned Bidder agrees to substantially complete the work for final acceptance within the number of calendar days specified on the Community Works work order. Bidder further agrees to pay as liquidated damages in the amount of $1500 for each consecutive calendar day thereafter that the work remains uncompleted. The Bidder shall submit with their bid a bid bond (proposal guarantee) equal to 5% of the total amount bid. The Engineer's Opinion of Probable Construction Costs (OPCC) is $600,000.00 Subcontractor's Listing Threshold: The Bidder shall list each Subcontractor on the Contractor's List of Subcontractor's, Form AF-5, that has provided a bid to them in the amount of $5000 or more. The bidder certifies that this bid is genuine and is not made in the interest of, or on the behalf of, any undisclosed person, firm, or corporation, and that this bid has been arrived at independently, without consultation, communication or agreement as to any matter related to this bid with any other Bidder or competitor. The City of Farmington reserves the right to change this date should it be in our best interest to do so. By submitting a bid, the Bidder indicates they have familiarized themselves with the conditions affecting the performance of the work and with the Contract Documents, including the Advertisement for Bids, Instruction to Bidders, Bid Proposal, Bid Bond, Agreement, Performance Bond, Labor, Material, and Tax Payment Bond, Notice of Award, Notice to Proceed, Conditions of Contract, Special Conditions, Drawings, Specifications and all Addenda thereto, as prepared by the City of Farmington, all of which are made a part hereof, hereby proposes, in accordance with said Contract Documents, to furnish all plans, equipment, labor, materials and supervision to perform the work summarized hereafter on each Bid Schedule upon which a proposal amount is inserted. The total bid for each Bid Schedule includes all work necessary to complete that portion of the project described in each Bid Schedule, and the total of all Bid Schedules represents the entire scope of work covered by the Contract Documents. If a particular item of work is not specifically separated as a bid item, the cost therefore shall be included in the bid item most nearly related.

Final Planning

Water / Sewer

$600,000.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

10

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
6
Active Projects
2
Bidding Soon
56
All Active Projects
25
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 30, 2024

May 30, 2024

img_map_placeholder

Multiple Locations, Farmington, NM

Related To This Project


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.