BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Renovation of an educational facility in Myrtle Beach, South Carolina. Completed plans call for the renovation of a educational facility.

A. The Project consists Storefront and Window Replacement for Horry Georgetown Technical College, Building 600, Grand Strand Campus. B. Project locations as described in Contract Documents. C. Contract Documents, dated February, 2024 were prepared for the Project by PIKE - McFARLAND - HALL Associates, Inc., 1300 Professional Drive, Suite 201, Myrtle Beach, SC 29577. D. The Work consists 1. The scope of work includes removal and replacement of existing storefront, entrance doors, hardware and windows. Existing EIFS and interior finishes directly associated with the new work will require repairs to match existing materials and finishes. 2. Painting is limited to those exterior and interior areas that will need to be finished to match existing after demolition.There is no civil, structural, mechanical, plumbing or electrical included in the project. E. General: During the demolition/construction period the contractor's use of the premises shall be limited to only those spaces necessary to accomplish the work. Use of the site shall be limited as indicated on the Construction Documents. Scope of work includes removal & replacement of existing storefront, entrance doors, hardware and windows. Existing EIFS & interior finishes directly associated with the new work will require repairs to match existing materials & finishes. Painting is limited to those exterior and interior areas that will need to be finished to match existing after demolition. There is no civil, structural, mechanical, plumbing or electrical included in project. BID SECURITY IS REQUIRED IN AN AMOUNT NOT LESS THAN 5% OF THE BASE BID. PERFORMANCE AND LABOR & MATERIAL PAYMENT BONDS: The successful Contractor will be required to provide Performance and Labor and Material Payment Bonds, each in the amount of 100% of the Contract Price Construction Cost Range: $350,000 to $450,000 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Award

Educational

$446,000.00

Public - State/Provincial

Renovation

7

9

10

5

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
74
Active Projects
44
Bidding Soon
517
All Active Projects
253
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 16, 2024

May 16, 2024

img_map_placeholder

743 Hemlock Ave, Myrtle Beach, SC

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.