BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 14, 2024 at 8:00 PM

Updated May 15, 2024

Site work and paving for a mixed-use development in Vienna, Wisconsin. Completed plans call for site work for a bridge / tunnel; for paving for a bridge / tunnel; road / highway; road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

**As of May 14, 2024, the project was awarded to Clemens Excavating Co for a total of $262,901.60 (base: $218,409.60, alternate: $44,492.00).** Pulverizing/Milling and reshaping approximately 1,300 linear feet of roadway. Installation of 800 feet of curb & gutter, 367 feet of storm sewer/culverts, 4 storm inlets, shouldering, ditching, excavation, restoration, and erosion control. The Contract award shall be made based on the lowest responsive and responsible Bidder. No proposal will be accepted unless accompanied by a certified check or bid bond equal to at least 5% of the amount bid, payable to the owner as a guarantee that if the bid is accepted the bidder will execute the project contract. The bid bond will be returned to the bidder once the contract has been signed. The Town of Vienna reserves the right to reject any and all bids, to waive any technicality and to accept any bid that it deems advantageous. All bids shall remain subject to acceptance for forty-five (45) days after the time set for bid opening. Est. Completion Date: Aug. 23, 2024 Question Deadline 03/28/2024 All questions about the meaning or intent of the Bidding Documents are to be submitted to Engineer in writing.

Award

Roads / Highways

$262,901.00

Public - City

Paving, Site Work

14

9

5

Subscribe For Documents

16 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
400
Active Projects
245
Bidding Soon
1,572
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 4, 2024

May 6, 2024

Project location map

Nature Valley Dr, Vienna, WI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.