EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published March 18, 2024 at 8:00 PM

Updated October 1, 2024

This is a service / maintenance or supply contract in Young, Arizona. Contact the soliciting agency for additional information.

This is a Request for Proposal (RFP) for: Weekly lagoon inspections, monthly lift station inspections (at Adair Rest Area only), mechanical vegetation maintenance of lagoon dikes, predischarge/discharge sampling, lagoon discharges per the permit requirements, lagoon liner repairs, and to provide inspections/reports to MDOT weekly Contractor must furnish all labor, equipment, materials, and supplies necessary for the performance of the Contract activities, and meet operational standards, to ensure compliance with the NPDES Wastewater Discharge General Permit, Wastewater Stabilization Lagoon Effluent. Work items include weekly lagoon inspections, monthly lift station inspections (at Adair Rest Area only), mechanical vegetation maintenance of lagoon dikes, predischarge/discharge sampling, lagoon discharges per the permit requirements, lagoon liner repairs, and to provide inspections/reports to MDOT weekly. Inspections must be completed by a C-1c certified wastewater operator.

Post-Bid

Water / Sewer

Public - State/Provincial

Service, Maintenance and Supply

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Quality Requirements, Regulatory Requirements, Execution and Closeout Requirements, Execution, Application
Division 09 - Finishes

Division 09 - Finishes

Tiling
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Signage
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
39
Active Projects
19
Bidding Soon
663
All Active Projects
256
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 27, 2024

April 26, 2024

img_map_placeholder

Multiple Locations, Young, AZ

Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Wastewater Stabilization Lagoon Effluent

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.