BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 5, 2024 at 8:00 PM

Updated April 6, 2024

Site work for a bridge / tunnel in Burnaby, British Columbia. Completed plans call for site work for a bridge / tunnel.

The project involves the structural rehabilitation of the Burnaby Lake Bridge Pier situated at the Burnaby Lake Pavilion, 6871 Roberts St, Burnaby, BC. The scope of work encompasses the replacement of the composite concrete deck, upgrading of railings, and the replacement of timber stringers and pile caps. Additionally, the project includes the replacement of utilities, installation of lighting systems, and the construction of a new south approach ramp supported on helical piles and all works incidental thereto as shown on the drawings. Documents can be obtained from https://burnaby.bidsandtenders.ca/

Bid Results

Bridges / Tunnels

$1,783,573.00

Public - City

Site Work

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

17 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
102
Active Projects
1
Bidding Soon
1,460
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 4, 2024

May 15, 2024

Project location map

6871 Roberts St, Burnaby, BC

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.