Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published March 20, 2024 at 8:00 PM

Updated March 21, 2024

Renovation of a mixed-use development in Durham, North Carolina. Completed plans call for the renovation of a educational facility.

This initiative aims to upgrade aging elevator systems to ensure reliable and efficient vertical transportation throughout the building. The scope includes assessing, procuring, installing, and commissioning new elevator units and adhering to safety standards and compliance regulations for elevators in Bryan, Reynolds, Watts, Hill, and Hunt buildings. o Assessment: Conduct a comprehensive evaluation of the existing elevator systems within the designated facilities to determine their condition, performance, and suitability for replacement. o Planning: Develop a detailed plan for the phased replacement of elevators, considering factors such as building occupancy, usage patterns, and operational requirements. o Safety Enhancements: Implement safety enhancements by the latest elevator safety codes and regulations. This may include the installation of advanced safety features and emergency communication systems. o Control System Upgrade: The outdated analog logic controls will replace state-of-the- art digital control systems. This upgrade aims to improve operational efficiency, responsiveness, and system reliability. o New Control System: Integrate a new control system that enhances the elevator's performance, efficiency, and adaptability to future technological advancements. o Cabin Rebuilding: The existing elevator cabs will be evaluated for a complete rebuilding or replacement process to meet modern safety and aesthetic standards. This includes upgrading interior finishes, lighting, and accessibility features. o Testing and Certification: Conduct rigorous testing and certification processes to ensure the modernized elevators meet all safety and performance criteria. 02/28/2024: Questions Due 03/01/2024: Answers Posted All Questions by proposers sent via email only to Robert Allen Vice Chancellor For Finance and Operations allenr@ncssm.edu and Cc: Douglas Hall, AIA dhall@thinkbha.com

Post-Bid

Educational

$1,600,000.00

Public - State/Provincial

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
300
Active Projects
141
Bidding Soon
2,072
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 19, 2024

May 20, 2024

Project location map

1219 Broad St, Durham, NC

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed