BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and new construction of a mixed-use development in Eureka, Missouri. Completed plans call for the construction of a fire / police facility; for site work for a fire / police facility; municipal facility; and municipal facility.

The City of Eureka is soliciting qualifications from firms to provide Commissioning Authority Services for the construction of a new Government Center comprised of City Hall, Police Department and Municipal Court located at 100 City Hall Drive, Eureka, MO. If you intend to submit a response to the RFQ for the City's consideration, please create an account and subscribe to the Request for Qualifications option (which is under Bid Postings) to receive notifications of any addendums which may be issued. Click on the View Documents button below for PDFs of the plan and specifications. No faxed, emailed or late proposals will be accepted. The City will not be responsible for proposals placed in the mail which do not arrive by the deadline. Proposals received before the time of opening will be kept by the City Clerk securely and unopened. Proposals received after the deadline will not be considered. All questions or comments regarding this solicitation package must be submitted in writing no later than 5:00 p.m. CDST, on March 21, 2024 to: David Bradley, Project Manager, NAVIGATE Building Solutions by e-mail to davidb@navigatebuildingsolutions.com. The City of Eureka reserves the right to reject any or all responses, or any part thereof, or waive irregularities or defects in same, or accept any proposal deemed to be in the best interest of the City of Eureka. The City of Eureka, Missouri (herein after the "City") intends to engage a firm to provide Commissioning Authority (CxA) for the proposed City Hall, Police Department and Municipal Court facility located at 100 City Hall Drive. Exhibit A constitutes the current proposed Construction Documents set of drawings developed by Archimages, Inc. for the new facility. The proposed new station is a single story, approximately 23,695 square feet (herein after the "Project"). As a condition to the contract award, the selected firm is required to enter into an agreement with the City of Eureka for the performance of the services defined herein. The City of Eureka is contracted with Navigate Building Solutions, LLC to Owner's Representative Services. This firm will coordinate with Navigate Building Solutions, LLC for performance of this contract. Interested firms and all representatives thereof are prohibited from contacting any elected officials until after a final selection has been made by the City of Eureka (City Staff and Board of Aldermen).

Under Construction

Municipal

$11,530,145.00

Public - City

New Construction, Site Work

157

32

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
195
Active Projects
98
Bidding Soon
1,371
All Active Projects
593
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

March 27, 2024

April 26, 2024

December 31, 2024

img_map_placeholder

100 City Hall Dr, Eureka, MO

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.