BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a pre-engineered storage facility in Green Bay, Wisconsin. Working plans call for the renovation of a pre-engineered storage facility.

2. Section 779.15 regarding lien on contractors 3. Section 66.0901(2) regarding proof of responsibility. All bidders shall provide proof of responsibility on the form furnished by the Director of Public Works and it shall be filed with the Director of Public Works not less than five (5) days prior to the time set for opening of bids. Said proof of responsibility shall not be valid if filed prior to one year of the date of opening bids. The Director Of Public Works Office In The Green Bay City Hall. In General, The Repair Work Involves Concrete Repairs And Coating. The Work Will Take Place At The West Side Municipal Garage Located At 519 S Oneida Street, Green Bay, Wi. In accordance with Section 42-2 of the City of Green Bay Code of Ordinances, any corporation, firm, or individual violating Chapter 133.01 of the Wisconsin Statutes, or any subsequent amendment thereof, shall upon conviction thereof be thereby disqualified as a bidder on any City of Green Bay project for a period of three (3) years from the date of such conviction; however, nothing herein shall be interpreted to preclude such corporation, firm, or individual from completing any and all contracts he/she may already have with the City at the time of such conviction, nor shall this ordinance be applied retroactively to convictions occurring prior to the adoption and publication of this ordinance. This prohibition applies with like force to officers of convicted corporations, firms, or individuals who thereafter have business interest in new corporations or business enterprises of whatever kind or description. The City of Green Bay, Wisconsin reserves the right to reject any or all bids and to waive any informalities in bidding. No bids shall be withdrawn after the opening of bids without the consent of the City of Green Bay, Wisconsin for a period of sixty (60) days after the scheduled time for closing bids. All proposals must be submitted on the Bidder's Proposal provided for that purpose and issued to the specific bidder by the Director of Public Works together with a certified check or a bid bond equal to at least five (5) but not more than ten (10) percent of the bid payable to the City of Green Bay as a guarantee that if his/her bid is accepted, he/she will execute and file the contract and a performance bond in the amount of one hundred percent (100%) of the total bid within ten (10) days after the award of the contract. Only the Proposal Pages, Surety Bid Bond, Affidavit of Compliance, Disclosure of Ownership and any Addenda issued shall be submitted. Only proposals submitted by firms appearing on the City of Green Bay list of plan holders will be opened. All work required in this contract shall be completed by August 16, 2024. In case the successful bidder shall fail to execute such contract and performance bond, the amount of the check or bid bond shall be forfeited to the City as liquidated damages. Published by the authority of the Improvement & Services Committee of the Common Council of the City of Green Bay, Wisconsin. Question Deadline 03/29/2024 All questions about the meanings or intent of the Contract Documents shall be submitted to the Engineer in writing. Replies will be issued by addendum mailed or delivered to all parties recorded by the Engineer as having received the Contract Documents. Only questions answered by formal written addendum shall be binding. Oral and other interpretations or clarifications shall be without legal effect. B. In order to guarantee a response, questions shall be submitted no later than four (4) ca ANY DESIGN QUESTIONS PERTAINING TO THIS PROJECT SHALL BE DIRECTED TO: DEPARTMENT OF PUBLIC WORKS 100 N. JEFFERSON STREET GREEN BAY, WI 54301 (920) 448-3100 In general, the repair work involves concrete repairs and coating. The work will take place at the West Side Municipal Garage located at 519 S Oneida Street, Green Bay, WI. All bids rejected

Final Planning

Warehouse / Distribution - Pre-Engineered Storage Building

$70,000.00

Public - City

Renovation

5

10

2

6

Subscribe For Documents

14 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
42
Active Projects
26
Bidding Soon
288
All Active Projects
122
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 2, 2024

May 24, 2024

img_map_placeholder

519 S Oneida St, Green Bay, WI

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.