BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 19, 2024 at 8:00 PM

Updated May 10, 2025

Site work for a water / sewer project in Butler, Pennsylvania. Completed plans call for site work for a water / sewer project.

This project shall generally include design, permitting, and construction of various sanitary sewer improvements including replacement and abandonment of select gravity sewer pipes and manholes to reduce inflow and infiltration, replacement of Pump Station Nos. 1 and 4 with new duplex submersible systems, replacement of Pump Station No. 2 with new duplex two-stage suction lift system, replacement of four sanitary sewer force mains, and associated electrical, structural, and HVAC improvements. Pipe replacement shall be completed through open trench and trenchless (pipe bursting and horizontal directional drilling) methods. Work will also include replacement of an existing stream culvert to address ongoing erosion concerns. SDB Participation Goal 8% VBE Participation Goal Engineer's 3% Estimate: Over $1M Bond Percentage 10.00% 04/01/2024 at 4:30 PM ET Q & A Deadline All questions must be received through the Bid Express Service. Questions asked via email, phone, or otherwise will not be answered.. Contractor is to begin work within ten (10) days after receipt of Notice to Proceed, and to complete work within Seven Hundred Thirty (730) calendar days. The tenth (10th) day after receipt of Notice to Proceed shall be the official starting date unless the ten (10) day period is extended in writing by the Secretary. It is understood that if the work is not completed within the time above specified or such extension thereof, as shall be granted in accordance with the General Conditions, the Contractor shall pay the Commonwealth of Pennsylvania as liquidated damages and not as a penalty for non-completion of work, the amount of One Thousand Dollars ($1,000.00) per day for each and every calendar day thereafter until the work shall be completed and accepted. The method of Contractor Selection has not been Determined at this time.

Bid Results

Water / Sewer

$7,249,998.00

Public - State/Provincial

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

19

Subscribe For Documents

59 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
218
Active Projects
101
Bidding Soon
1,650
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 11, 2024

December 11, 2024

Project location map

Multiple Locations, Butler, PA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.