BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 10, 2024 at 8:00 PM

Updated May 11, 2024

Site work and paving for a mixed-use development in Clearfield, Utah. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

Reconstruct 975 South and 1480 West. Work will include replacing the existing water and sewer lines with new manholes and piping, providing additional storm drain piping and catch basins, and replacing some areas of sidewalk, curb and gutter. This is not the full scope of work. See Bid Schedule and Drawings for additional info. Questions related to the Bidding Documents are to be submitted in writing to Shane Taggart, shane@jonescivil.com no later than 5:00 pm on March 28, 2024. COMPLETION DATE: November 1, 2024, See Agreement for more info. ENGINEER'S ESTIMATE: $1,991,322.50 BONDS/INSURANCE: Bids shall be accompanied by a Bid Bond. The selected Contractor shall guarantee all work with a Performance Bond, Payment Bond, and Warranty Bond. See Instructions to Bidders and Agreement for more info. Owner Rights: Owner reserves the right to reject any or all Bids, to waive any informality in a Bid, and to make awards in the best interests of the Owner. Owner reserves the right to reject any or all Bids, including without limitation, nonconforming, nonresponsive, unbalanced, or conditional Bids. Owner will reject the Bid of any Bidder that Owner finds, after reasonable inquiry and evaluation, to not be responsible. If Bidder purports to add terms or conditions to its Bid, takes exception to any provision of the Bidding Documents, or attempts to alter the contents of the Contract Documents for purposes of the Bid, then the Owner will reject the Bid as nonresponsive; provided that Owner also reserves the right to waive all minor informalities not involving price, time, or changes in the Work. LIQUIDATED DAMAGES : Provisions for liquidated damages, if any, for failure to timely attain a Milestone, Substantial Completion, or completion of the Work in readiness for final payment, are set forth in the Agreement.

Award

Roads / Highways

$1,602,357.00

Public - City

Paving, Site Work

28

18

3

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
121
Active Projects
24
Bidding Soon
1,067
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 2, 2024

June 3, 2024

Project location map

1480 W & W 975 S, Clearfield, UT


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.