Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 22, 2024 at 8:00 PM

Updated May 23, 2024

Renovation of a water / sewer project in Springtown, Texas. Completed plans call for the renovation of a water / sewer project.

This project consists of design improvements of the Surface Water Treatment Plant, which includes three (3) new pumps, one (1) new Trident Unit, 240 LF of 8" backwash supply line, 90 LF of 10" backwash supply line, and upgrades to the electrical equipment and controls. Bidders must submit a cashier's check, certified check, or acceptable bidder's bond with their proposal as a guarantee that the Bidder will enter into a contract for the project with the Owner within 15 days of Notice of Award of the contract. The security must be payable to Owner in the amount of 5 percent of the bid submitted. Contractor must execute the contract, bonds and certificates of insurance on the forms provided in the Contract Documents. Performance, Payment, and Maintenance Bonds are required. The Owner reserves the right to adopt the most advantageous interpretation of the bids submitted in the case of ambiguity or lack of clearness in stating proposal prices, to reject any or all bids, and/or waive formalities. Bids may not be withdrawn within 90 days from date on which bids are opened. Direct questions regarding distribution of Contract Documents for this project to Westwood. Direct questions related to the design of the project to: Project Manager Clint A. Bissett, PE 972-235-3031 Clint.bissett@westwoodps.com This project is to be substantially complete and ready for operation within 420 consecutive calendar days from the date of the notice to proceed. Final Completion of the project shall be achieved within 30 days of the Substantial Completion date. Liquidated damages are set forth in the Agreement. The City of Springtown reserves the right to reject any or all bids or to waive any informalities in the bidding.

Post-Bid

Water / Sewer

$300,000.00

Public - City

Renovation

26

27

60

8

Subscribe For Documents

108 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
390
Active Projects
149
Bidding Soon
4,452
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 21, 2024

June 20, 2024

Project location map

To Be Determined, Springtown, TX

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed