Published April 3, 2024 at 8:00 PM

Updated April 9, 2024

Site work and paving for a civil project in Elmhurst, Illinois. Completed plans call for site work for a road / highway; for paving for a road / highway; and water / sewer project.

CONTRACT DOCUMENTS The work shall include the replacement of watermain along IL-83 and Fellows Court. The approximate length of proposed 6" or less watermain is 300 LF, 8" watermain is 1,250 LF and 12" watermain is 1,950 LF. Every water service within the limits of the watermain replacement project will also be replaced. The work shall include the fittings; services; valves in vaults; valves in boxes; excavation and backfill; trench backfilling; removal and replacement of pavement, median, and curb and gutters; restoration of parkways; traffic control; system cleaning, testing and disinfecting; hydrants with valves; and all other related work. All proposals must be submitted on the forms provided and in compliance with the Instructions to Bidders. Submission of a bid shall be conclusive assurance and warranty that the bidder has examined the plans, the site of the work and the local conditions affecting the contract and understands all the requirements for performance of the work. The bidder will be responsible for all errors in its proposal resulting from failure or neglect to conduct an in-depth examination. The City of Elmhurst will in no case be responsible for any costs, expenses, losses or changes in anticipated profits resulting from such failure or neglect of the bidder. The bidder shall not take advantage of any errors or omission in the plans or proposal. All contractors/ subcontractors performing work must be pre-qualified by the Illinois Department of Transportation for: asphalt work (at a minimum HMA paving); concrete work (Concrete Construction); and watermain work (Drainage) respectively. BID SECURITY Each bid shall be accompanied by a proposal guaranty in the form of a bid bond, executed by a corporate surety company, a bank cashier's check or a certified check payable to the City of Elmhurst for not less than five percent (5%) of the amount bid. The proposal guaranty checks of all, except the two lowest responsible bidders, will be returned after the proposals have been checked and tabulated. The proposal guaranty checks of the two lowest responsible bidders will be returned after the contract and the contract bond of the successful bidder have been properly executed and approved. Bid bonds will not be returned. RIGHT TO REJECT BIDS The City of Elmhurst reserves the right to waive technicalities and to reject any and all proposals for any reason deemed in the best interest of the City of Elmhurst. AWARD OF CONTRACT Unless all bids are rejected, the contract award will be made to the lowest responsive responsible bidder. In determining who the lowest responsive responsible bidder is, the City of Elmhurst will consider all factors which it, in its discretion, deems relevant in determining who the lowest responsive responsible bidder is. Bidders who are awarded a contract shall be required to provide a Labor and Material Payment Bond and a Performance Bond, each in the total amount of the contract sum upon execution of the contract. PAYMENT OF PREVAILING WAGES The general prevailing rate of wages in DuPage County for each craft or type of worker or mechanic needed to execute the contract or perform the work, also the general prevailing rate for legal holiday and overtime work, as ascertained by the Illinois Department of Labor, shall be paid for each craft or type of worker needed to execute the contract or to perform the work. ***Bid Event: Sealed envelopes or packages containing bids shall be addressed to the Office of the City Clerk, Elmhurst City Hall, 209 N. York Street, Elmhurst, Illinois 60126, and shall be marked "Proposal for 2024 Watermain Improvements, Project No. 24-01." The undersigned Contractor agrees to complete the work for IL RTE 83 and Fellows Court within eightyeight (88) calendar days after the date the City gives the Contractor written notice to proceed, unless an extension of time is granted in accordance with the Specifications. Expected construction start date shall be in June, 2024. Substantial Completion date for IL RTE 83 shall be on or around September 2nd, 2024. In addition, the undersigned agrees to complete various specified construction operations specified in the Special Provisions on or before the various deadlines imposed by the Special Provisions. THE UNDERSIGNED AGREES TO PAY TO THE CITY THE LIQUIDATED DAMAGES SPECIFIED IN THE CONTRACT FOR FAILURE TO MEET THE DEADLINES THEREIN SPECIFIED ***Document Note: You may access the document by clicking on the "bidding documents" icon located at the top of the page, then selecting "browse projects" to find the "City of Elmhurst 2024 Watermain Improvements, Project No. 24-01" bid documents. Please complete a free membership registration to Quest. If you have any questions regarding the registration or download process, please contact Clark Dietz at (262) 657-1550. All submitted Bidding Documents shall be original copies obtained directly from Clark Dietz, Inc. Paper copies of the Bid Documents will not be made available for purchase. There will be a paper copy for viewing purposes only available at the City Clerk's Office, 2nd Floor, 209 N. York Street, Elmhurst, Illinois 60126. There will be a paper copy for viewing purposes only available at the City Clerk's Office, 2nd Floor, 209 N. York Street, Elmhurst, Illinois 60126.

Post-Bid

Water / Sewer

$300,000.00

Public - City

Paving, Site Work

46

7

2

2

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Administrative Requirements, Special Procedures, Alteration Project Procedures, Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Cleaning and Waste Management
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Subsurface Investigation, Material Testing
Division 11 - Equipment

Division 11 - Equipment

Vehicle and Pedestrian Equipment, Parking Control Equipment, Loading Dock Equipment
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Lifts
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, Testing, Adjusting, and Balancing for HVAC
Division 26 - Electrical

Division 26 - Electrical

Lighting
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Excavation and Fill, Subgrade Preparation, Excavation, Trenching, Dewatering, Fill, Backfill, Compaction, Tunneling and Mining
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Watering, Bases, Ballasts, and Paving, Curbs and Gutters, Paving Specialties, Pavement Markings, Planting, Turf and Grasses, Seeding, Sodding, Plants, Trees
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Coastal Construction, Shoreline Protection
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Lifting Devices, Lifts
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
172
Active Projects
94
Bidding Soon
2,179
All Active Projects
797
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 2, 2024

May 2, 2024

img_map_placeholder

Multiple Locations, Elmhurst, IL


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.