BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a municipal facility in Galena, Illinois. Completed plans call for the renovation of a municipal facility.

The City of Galena is requesting quotes for repairing limestone, removing a portion of the chimney, and associated improvements at Turner Hall, 115 S. Bench Street Scope of Project The City of Galena is requesting quotes to complete the work detailed below. All work to be in accordance with the latest versions of the International Building Code, Standard General Conditions of the Construction Contract and City Specifications Conditions 1. All Work performed under this contract shall be subject to compliance with the Illinois Prevailing Wage Act, including the latest revisions and the Illinois Preference Act. Contractors are required to submit certified copies of their payroll. 2. The City of Galena shall be exempt from any liability for loss incurred by unsuccessful bidders in preparation for this proposal. The City of Galena will make payment within thirty (30) days after acceptance of the completed work. The City of Galena reserves the right to reject any or all quotes. Questions concerning the project or arranging a site visit with City Staff should be directed to: Hillary Dickerson at hdickerson@cityofgalena.org. Specifications 1. Remove the first three sections of the parapet and the section of limestone indicated on Drawing #1, including the pillar between the two arched windows. Repair damage to the inner rubble wall and lintels. Replace outer stone where needed with stone as authentic to the building as possible. 2. Repoint with Type N mortar to match existing style, color, composition and texture of existing wall joints. 3. Reduce height of chimney by removing brick to end three feet above the rooftop units. Tuckpoint remaining brick to match existing style, color, composition and texture. Add chimney cap. See Drawing #2 Chimney. General 1. Contractor is responsible for providing access to all work areas in accordance with recognized health and safety requirements. 2. Contractor is responsible for all clean-up at the end of the project and will ensure that all excess materials are removed from the site. The City of Galena is requesting quotes for repairing limestone, removing a portion of the chimney, and associated improvements at Turner Hall, 115 S. Bench Street, as detailed below and available at www.cityofgalena.org under Departments/Engineering/Bid Documents. Questions concerning the project or arranging a site visit with City Staff should be directed to: Hillary Dickerson at hdickerson@cityofgalena.org

Award

Municipal

$44,750.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

7

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
78
Active Projects
36
Bidding Soon
699
All Active Projects
330
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 10, 2024

May 10, 2024

img_map_placeholder

115 S Bench St, Galena, IL

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.