EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 30, 2024 at 8:00 PM

Updated October 1, 2024

Site work and paving for a mixed-use development in Minneapolis, Minnesota. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

Location: Csah 3 and 61 in the Cities of Hopkins and Maple Grove. The Major Items of Work Are Approximately: 1 Lump Sum as Built; 1 Lump Sum Mobilization; 1872 Sq Ft Pavement Marking Removal; 3 Each Remove Casting; 2 Each Remove Drainage Structure; 20 Each Salvage Sign Type C; 102 Lin Ft Remove Sewer Pipe (Storm); 1986 Lin Ft Remove Curb & Gut- Ter; 47 Lin Ft Remove Retaining Wall; 7343 Sq Ft Remove Bitumi- Nous Walk; 3900 Sq Ft Remove Concrete Walk; 996 Sq Ft Remove Brick Pavers; 6651 Sq Ft Remove and Replace Bituminous Pave- Ment; 28 Hour Street Sweeper (With Pickup Broom); 124 Lin Ft 12 Rc Pipe Sewer Des 3006 Cl V. 3 Each Adjust Valve Box; 5 Each Casting Assembly; 5 Each Adjust Frame & Ring Casting; 15 Lin Ft Const Drainage Structure Design N; 3 Each Connect Into Existing Drainage Structure; 2041 Sq Ft 3" Bituminous Walk: 653 Each Drill & Grout Reinf Bar (Epoxy Coated); 13119 Sq Ft Concrete Curb Ramp Walk; 2025 Lin Ft Concrete Curb & Gutter; 186 Lin Ft Concrete Curb Design V; 1040 Sq Ft Truncated Domes; 9 Each Adjust Handhole; 1 Lump Sum Traffic Control Supervisor; 1 Lump Sum Traffic Control; 1 Lump Sum Alternate Pedestrian Route; 60 Unit Day Portable Changeable Message Sign; 20 Each Install Sign Type C; 8 Each Adjust Handhole; 1 System Revise Signal System a; 1 System Revise Signal System B; 1 Lump Sum Erosion Control Supervisor; 32 Each Storm Drain Inlet Protection; 200 Lin Ft Sediment Control Log Type Compost; 34 Each Site Resto-Ration; 1566 Sq Ft Crosswalk Paint;0;0;0;0; All in Accordance With Specifications and Bid Forms. Questions regarding the preparation of a Construction AA Plan should be directed to Tina Sanz, Construction Compliance Manager at tina.sanz@hennepin.us or (612) 348-3929. CONSTRUCTION EMPLOYMENT GOALS Minorities Women (Male & Female Minorities) (Minority & Non-minority Females) Skilled & Unskilled Combined 32% Skilled & Unskilled Combined 20% Direct questions about this Project, including pre-bid questions, to Eric Drager at Eric.Drager@hennepin.us.

Award

Roads / Highways

$728,058.00

Public - County

Paving, Site Work

80

7

4

7

Subscribe For Documents

25 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
127
Active Projects
66
Bidding Soon
866
All Active Projects
449
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 9, 2024

June 24, 2024

img_map_placeholder

Multiple Locations, Minneapolis, MN

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.