Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Renovation of a hospitality development in Toledo, Ohio. Completed plans call for the renovation of a hospitality development.
Restore rip rap along embankment at point place and swan creek levees at places indicated on attached maps. This project WILL require a PLA, as it is part of an overall program with a value over $100,000 Q&A Deadline 04/25/2024 4:00 PM (EDT) In order to be responsive, all bids must have the following with submittal: o Project Paperwork* o Signed Contract by the Vendor* o Child Support Affidavit* o Pricing Sheet ** (will auto-populate with e-bid) o Insurance Certificate, naming the City of Toledo as an additional insured / Certificate Holder o Current Bureau of Worker's Compensation Certificate o Bid Guaranty: bid bond or certified/cashier's check on a solvent bank; see instructions below *Located on the "Documents" tab of Online. **Located in the Line Items tab of PlanetBids Bid Guaranty requirements are located on the "Bid Information" tab in the Bid Detail section. The bid guaranty shall be in the form of a cashier's check/official check on a solvent bank or a bid bond. If using a check as the bid guaranty, the check must be received by the Division of Purchases and Supplies no later than the due date and time to be deemed responsive. The check must also be scanned and uploaded with the e-bid. Company checks and personal checks will NOT be accepted. Checks shall be made payable to "City of Toledo." If your company is using a bid bond, scan and upload with bid; the original does not need to be received by the City of Toledo. If your company does not provide a bid guaranty, your bid submittal will be deemed non-responsive. (TMC 187.09) Notes As noted above, City forms must be filled out and attached to the bid. Project Paperwork includes the following: Acknowledgment and Acceptance of Conditions Contract Specifications; Toledo Municipal Income Tax Compliance; Public Utilities Compliance; MBE Good Faith and Goal Commitment; EEO Form; Primary and Subcontractor Forms and Debarment and Suspension Certificate; Best Bid Criteria. Other required forms include those noted in the Response Type Section and also noted in the Other Details Section: Signed Contract by Vendor CEO/President; Child Support Affidavit; Insurance Certificate listing the city of Toledo as an additional insurer; and Current Worker's Compensation Certificate. The following items will be required upon awarding the contract: Performance Bond and PLA, if applicable. Preferences MBE - Minority-Owned Business Enterprise WBE - Woman-Owned Business Enterprise Bid Bond - 5.00% Payment Bond - 0.00% Performance Bond - 0.00%
Post-Bid
Hotel / Motel
$59,775.00
Public - City
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
4
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 30, 2024
May 30, 2024
To Be Determined, Toledo, OH
Related To This Project
Toledo, OH
Bid Date: Mar 19 2024
Toledo, OH
Bid Date: Mar 19 2024
Toledo, OH
Bid Date: Mar 19 2024
Toledo, OH
Bid Date: Mar 19 2024
Toledo, OH
Bid Date: Apr 12 2024
Toledo, OH
Bid Date: Mar 19 2024
Toledo, OH
Bid Date: Mar 19 2024
Toledo, OH
Bid Date: Mar 19 2024
Toledo, OH
Bid Date: Apr 10 2024
Toledo, OH
Bid Date: Jun 17 2019
Toledo, OH
Bid Date: Apr 02 2024
Toledo, OH
Bid Date: Mar 22 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.