EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 16, 2024 at 8:00 PM

Updated October 1, 2024

Site work for a water / sewer project in Milledgeville, Illinois. Completed plans call for site work for a water / sewer project.

As of May 16, 2024 project was awarded to Hoerr Construction, Inc., but awarded amount is not available. Site Directions: Various locations throughout the Village of Milledgeville. Description: Lining approximately 11,288 lineal feet of sanitary sewer ranging in size from 8" to 12" diameter, sewer service grouting and reconnection of approximately 144 services, sanitary sewer spot repairs, lining of 13 sanitary manholes, and the replacement of 2 sanitary manholes. A certified check or bank draft on a responsible solvent bank, or a satisfactory bid bond executed by the bidder on an acceptable surety company, payable to the Village of Milledgeville, Illinois, in an amount not less than five percent (5%) of the total bid shall be submitted with each bid. The successful bidder will be required to furnish satisfactory performance and payment bonds each for 100% of the awarded contract price. No bid shall be withdrawn after the opening of bids without the consent of Village of Milledgeville for a period of ninety (90) days after the scheduled time of receiving bids. The Village of Milledgeville is an equal opportunity employer. The Village of Milledgeville does not discriminate on the basis of handicapped status in the admission or access to, or treatment or employment in, its programs or activities. The Village of Milledgeville, Illinois reserves the right to reject any non-responsive bid and/or non responsible bid. Bids may be held by the Village of Milledgeville, Illinois for a period not to exceed ninety (90) days from the date of the opening of bids for the purpose of reviewing the bids and investigating the qualifications of bidders, prior to awarding the Contract. All work under this contract shall be substantially complete within 120 calendar days and final completion shall be within 180 calendar days from the execution of the Notice to Proceed.

Award

Water / Sewer

$300,000.00

Public - City

Site Work

6

6

7

7

Subscribe For Documents

15 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Substitution Procedures, Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Construction Facilities, Field Offices and Sheds, Vehicular Access and Parking, Traffic Control, Project Identification, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cleaning and Waste Management, Final Cleaning, Closeout Procedures, Closeout Submittals, Warranties, Project Record Documents, Spare Parts
Division 03 - Concrete

Division 03 - Concrete

Concrete Reinforcing, Reinforcing Steel, Cast-in-Place Concrete, Concrete Curing
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

HVAC Air Distribution, HVAC Ducts and Casings
Division 31 - Earthwork

Division 31 - Earthwork

Earth Moving, Excavation and Fill, Excavation, Backfill
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Planting, Planting Preparation, Mulching, Turf and Grasses, Seeding, Plants, Trees
Division 33 - Utilities

Division 33 - Utilities

Utilities, Operation and Maintenance of Utilities
Division 34 - Transportation

Division 34 - Transportation

Transportation

Find More Local Projects

Within 75 Miles of This Project
115
Active Projects
67
Bidding Soon
866
All Active Projects
392
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 30, 2024

May 30, 2024

img_map_placeholder

Multiple Locations, Milledgeville, IL

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Sewer System Improvements - Sanitary Sewer Lining

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.