BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and new construction of a golf course in Dayton, Iowa. Completed plans call for the construction of a golf course; and for site work for a golf course.

The Project consists of the site development and construction of a new Events Center at Oak Park Golf and Recreation . The Work includes concrete trench footings and slabs, wood framing, shop-fabricated wood trusses, casework, millwork, PVC membrane roofing, standing seam roofing, insulation, engineered wood siding, hollow metal doors, fiberglass windows, gypsum board finishes, floor and wall tile, resilient base, corner guards, toilet accessories, acoustic suspended ceilings, painting, fire sprinkler, fire alarm, by-owner kitchen/bar equipment, plumbing, mechanical, electrical, and civil work. The Prime Contractor submitting the Bid shall provide and coordinate all Work required for this Project. Starting time for construction shall be within ten (10) days after the written Notice to Proceed is issued. The estimated starting date on site is Monday, May 13, 2024. Preparation and ordering of materials shall occur prior to the start of construction. Substantial Completion of the project shall be no later than Monday, November 18, 2024. Bidders may seek clarification of the drawings and specifications and from the Architect and propose substitutions prior to 12:00 Noon, Wednesday, April 10, 2024 at which time no further information will be provided other than what is shown in the Drawings and Project Manual. The purpose for the deadline is to insure adequate time for preparation and issuance of an addendum, if needed, on Thursday, April 11, 2024. It is the intention of this request that addenda after this date may not be necessary. Each proposal shall be accompanied by a bid bond, certified check, cashier's check or certified share draft in a separate sealed envelope, clearly marked "Bid Bond" or Bid Security", in an amount equal to five percent (5%) of the total amount of the proposal. The certified or cashier's check shall be drawn on a bank in Iowa or a bank chartered under the laws of the United States of America or the certified share draft shall be drawn on a credit union in Iowa or chartered under the laws of the United States and payable to the City of Dayton. Said check or share draft may be cashed, or the bid bond forfeited as liquidated damages in the event the successful bidder fails or refuses to enter into a contract within ten (10) days of issuance of a Notice of Award and post bond satisfactory to the City of Dayton insuring thefaithful fulfillment of the contract and maintenance of said improvements as required by law. The bid bond should be executed by a corporation authorized to contract as a surety in the State of Iowa and must not contain any conditions either in the body or as an endorsement thereon. Such bid security will be returned to all except the three lowest bidders within three (3) days after the opening of bids and the remaining cash, checks or bid bonds will be returned promptly after the Owner and the accepted Bidder have executed the Contract, or if no award has been made within thirty (30) days after date of the opening of bids, upon demand of the Bidder at any time thereafter, so long as he has not been notified of the acceptance of his bid. The successful bidder will be required to furnish performance and payment bonds in an amount equal to one hundred percent (100%) of the contract price, said bond to be issued by a responsible surety approved by the City Council of the City of Dayton, and shall guarantee the faithful performance of the contract and the terms and conditions therein contained, the payment for labor and materials used in the project and the maintenance of said improvements in good repair for not less than one (1) year from the time of acceptance of said improvements by the City Council of the City of Dayton. The right is reserved, as the interest of the Owner may require, to reject any and all bids, to waive any informality in bids received, as allowed by law. Bids may not be withdrawn for thirty (30) consecutive calendar days of opening.

Bid Results

Golf Course

$1,535,477.00

Public - City

New Construction, Site Work

60

24

21

4

Subscribe For Documents

35 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
57
Active Projects
34
Bidding Soon
559
All Active Projects
209
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 16, 2024

May 13, 2024

img_map_placeholder

105 Oak Park Rd, Dayton, IA

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.