BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Detroit, Michigan. Completed plans call for site work for a water / sewer project.

Reference Number 0000346439 The Wayne County Airport Authority (Airport Authority) is soliciting bids from general contractors, construction managers and other businesses that meet the qualifications set forth herein for the McNamara Parking Deck. The project includes floor drain replacement and associated concrete slab and joint sealant repairs, and horizontal and vertical piping replacement. The scope of work is to occur throughout levels 4-10 of the structure. The contract scope of work awarded with this solicitation is intended to be completed during the construction season of 2024 - 2027. (The Contract resulting from this solicitation is subject to Airport Authority Prevailing Wages Requirements.) Question Acceptance Deadline 04/02/2024 02:00 PM EDT All questions regarding this RFB must be submitted to the Procurement Contact at the above number and email address. Contact concerning this RFB with any other employee, officer or Board Member of the Airport Authority is not permitted during the solicitation process. Procurement Contact: Darwin Hadley, Solicitation Manager Phone: (734) 247-7900, Fax: (734) 955-5648 purchasing.questions@wcaa.us Buyer Preferences, Guidelines & Requirements Participation Requirements - Small Business Participation General Requirements - Bid Deposit Required - Certified Payroll - FOB Destination - Insurance Required - Local Service Required - Prevailing Wage Required - Safety Standards Plan - Security Badges Bonding Requirements - Bid Bond 5 % - Performance Bond 100 % - Labor and Materials Bond 100 % Substantial Completion of Construction - shall be achieved within a total of 840 calendar days of the NTP for construction. A total of 280 calendar days will be allotted for full construction seasons in each of years 2025 and 2026, and a combined total of 280 calendar days will be split between partial construction seasons in years 2024 and 2027. The 840 calendar days will be achieved through the sum of the four-construction season's substantial completion clauses, which will be detailed in each NTP. The number of days allowed to achieve Substantial Completion in each construction season will be based on the Airport Authoritys approval of the contractors proposed construction schedule for that construction season. The Airport Authority will determine the allowed number of days per construction season per year and it will be based on parking variability. No additional costs associated with changes, variations, or delays to the construction season(s) will be allowed. f) Final Completion - Construction work including all restoration, cleanup, completion of punch list and removal of temporary pedestrian traffic control and safety devices shall be no later than 90 calendar days after the Substantial Completion date for that construction season. Construction will not be considered to be complete unless all project construction tasks are completed The Airport Authority reserves the right to cancel this solicitation, in whole or in part, as well as reject any or all bids, or to accept or reject any bid in part, and to waive any minor informality or irregularity in bids received if it is determined by the Chief Executive Officer (CEO) or his designee that the best interest of the Airport Authority will be served by so doing.

Bid Results

Water / Sewer

$5,796,880.00

Public - County

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

12

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
341
Active Projects
199
Bidding Soon
2,757
All Active Projects
1,095
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

April 15, 2024

May 15, 2024

December 1, 2026

img_map_placeholder

1 Detroit Metro Airport, Detroit, MI

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.