Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published January 7, 2025 at 7:00 PM
Updated January 8, 2025
Site work and new construction of a civil project in Pearland, Texas. Conceptual plans call for site work for a water / sewer project; and for the construction of a water / sewer project.
The City is constructing a 10 million gallons per day (MGD) surface water treatment plant to serve the City with drinking water in 2023. The Surface Water Treatment Plant (SWTP) currently does not have a large water reservoir (Forebay) that can store raw water for when the cannel is out of service. The project would be to construct an earthen reservoir to store raw water from the Gulf Coast Water Authority's (GCWA) canal. The project would include pipping from the canal to the Forebay, construction of the Forebay, clay liner, and a pump station and piping back to the SWTP. The City's water model indicates that under current demands should the SWTP be down the existing groundwater system can supply current demands. Future year (2030 model) indicates the need for the SWTP and wells to meet the system demands. A Forebay will be required to have raw water available for canal shutdowns. This project is included in the city’s fy 2025-2028 Capital Improvement Program. As of January 7, 2025, further details regarding construction and completion timelines have not been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.
Conceptual
Water / Sewer
$42,920,000.00
Public - City
New Construction, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 1, 2028
To Be Determined, Pearland, TX
Related To This Project
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
