BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Lake Butler, Florida. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

Counties : Union Road Name: SR121 @ SR231 FROM BMP 2.400 TO EMP 2.600 - Add Turn Lane(S) Limits: 39090000 Project(s): 44572615201(*) Federal Aid No: N/A Total Roadway Length: 0.300 Miles Total Bridge Length: 0.000 Miles Total Proposal Length: 0.300 Miles Contract Days: 45 Contract Execution Days: 180 Special Start Date: N/A Aquis/Flexible Start Time: 120 Days (acq. time) Description: (Sr 231 at Sr 121 From Sw 9th St to Sw 3rd St) the Improvements Under This Contract Consist of Milling and Resurfacing, Base Work With Turn Lane Widening, Drainage Improvements, Curb and Gutter, Highway Signing, Signals, and Other Incidental Construction On Sr 231 @sr 121 From Sw 9th St to Sw 3rd St in Union County. Prequalification Required. Question Deadline 04/10/2024 at 5:00 PM ET Questions posted to this site will be responded to by the Department. For questions posted after this time, an answer cannot be assured. For all questions posted before the deadline, FDOT will provide and post responses on online. For bids over $150,000.00, the standard proposal guaranty of 5% of the bid will be required, unless otherwise stipulated in the proposal advertisement. A Proposal Guaranty of not less than five percent (5%) of the total actual bid in the form of either a certified check, cashier's check, trust company treasurer's check, bank draft of any national or state bank, or a Surety Proposal Guaranty made payable to the Florida Department of Transportation must be received for each bid in excess of $150,000.00 A 100% Payment and Performance Bond will be required for all projects. All work is to be done in accordance with the Plans, special Provisions of the State of Florida Department of Transportation. FDOT - Call Order: 010 - Hot Plant-Mixed Bituminous Courses, Traffic Signal, Mobilization, Maintenance of Traffic - SR 231

Award

Roads / Highways

$2,930,266.00

Public - State/Provincial

Paving, Site Work

45

3

6

Subscribe For Documents

34 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
168
Active Projects
95
Bidding Soon
1,423
All Active Projects
560
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

April 17, 2024

April 27, 2024

October 14, 2024

img_map_placeholder

FL-121, Lake Butler, FL

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.