BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a conference / convention center in Abilene, Texas. Completed plans call for the renovation of a conference / convention center.

The Contractor shall provide a complete, workable, and operational system(s) including all labor, equipment, tools, material, engineering, supervision, licenses, insurance, permits and bonds to engineer, manufacture and install a fully integrated and operational system(s), including all noted peripheral elements highlighted by the following system(s) categories: A. Replacement of existing marquee, including removal of existing marquee and providing new marquee, pole cover and signage. All inquiries for information should be directed to: Jack Bailey, Anthony James Partners, LLC., as acting representative for City of Abilene. Phone (503) 803-9301 or Email jackbanthonyjamespartners.com. In the event of error in extension, unit prices will govern. Unless otherwise specified, the City of Abilene reserves the right to accept or reject in part or in whole, any proposal submitted, for the best interest of the City. Anticipated Award Date: April 25, 2024 Substantial Completion Date: August 31, 2024 Guaranteed Completion Date: September 16, 2024 Question Deadline 04/03/2024 at 5:00 PM CT All inquiries for information should be directed to: Jack Bailey, Anthony James Partners, LLC., as acting representative for City of Abilene. Phone (503) 803-9301 or Email jackbanthonyjamespartners.com. Issue Answers to Inquiries: April 8, 2024 by 5:00 p.m. CST Should Contractor fail to achieve Substantial Completion by August 31, 2024, as that Contract Substantial Completion Date may be revised by Change Order pursuant to the terms of the Contract, the Contractor shall pay to Owner, as liquidated damages, Five Thousand Dollars ($5,000) per day for each calendar day between the Contract Substantial Completion Date and the date Contractor achieves Substantial Completion as defined herein or until the Contract Guaranteed Completion Date, whichever is earlier. In addition, should Contractor fail to achieve Contract Guaranteed Completion by September 16, 2024 the Contract Guaranteed Completion Date as that date may be revised by Change Order pursuant to the terms of the Contract, the Contractor shall pay the Owner, as liquidated delay damages, Ten Thousand Dollars ($10.000) per day for each calendar day between the Contract Guaranteed Completion Date and the date Contractor achieves Guaranteed Completion as defined herein. A. The Owner reserves the right at its sole discretion at any time without reason, and without liability to the Proposers or anyone else, by addenda to modify, amend or otherwise change, to extend any schedule or time periods specified within, and to suspend, postpone or cancel, the RFP. All such addenda shall be issued by the Owner in writing and shall be expressly identified as an addendum to this RFP. B. The Owner reserves the right to cancel this RFP and issue a new request for proposals for any or all parts of the provision of the Services at its discretion. In such case, the Owner may proceed in such manner as the Owner, at its sole discretion, considers appropriate to obtain the best overall value for the Owner.

Post-Bid

Conference / Convention Centers

$500,000.00

Public - City

Renovation

7

5

6

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
9
Active Projects
4
Bidding Soon
147
All Active Projects
65
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 17, 2024

April 26, 2024

img_map_placeholder

1100 N 6th St, Abilene, TX

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.