Published August 23, 2025 at 8:00 PM
Updated August 24, 2025
Site work and paving for a road / highway in Asheville, North Carolina. Working plans call for site work for a road / highway; and for paving for a road / highway.
https://www.ashevillenc.gov/news/mid-year-momentum-2025-infrastructure-progress-future-outlook/ Asheville City Council unanimously approved the $256.36 million budget for the fiscal year 2026 at their regular meeting on June 10. The spending plan includes a robust Capital Improvement Plan (CIP) that focuses on storm recovery, parks, transportation, public safety and community infrastructure over the next five years. Projects are selected for funding in the CIP based on several criteria including: enhancing core services, supporting strategic priorities, availability of outside funding sources, potential return on investment, and extending the useful life of City assets. With storm recovery and the 2024 voter-approved $80 million General Obligation (GO) Bond now integrated as key infrastructure priorities, the City of Asheville is steadily progressing on its project commitments and remains dedicated to preparing for future evolving needs in order to strengthen Asheville's infrastructure and economic stability. Storm Recovery The City has kicked off several major recovery projects with a focus on comprehensive restoration of City-owned infrastructure along the riverfronts. Concurrently, the City continues to accomplish smaller projects to repair damage and reopen amenities where manageable. Cost recovery through FEMA's Public Assistance program will be the primary source of funding enabling the City to rebuild public infrastructure. The City began official damage assessments with FEMA in early 2025, and that process continues to make headway. Other potential federal funding sources for infrastructure recovery projects include the Community Development Block Grant - Disaster Recovery program, and the Hazard Mitigation Grant Program. Adopted 2024 Bond Referenda In November 2024, Asheville voters approved four General Obligation Bond Referendums totaling $80 million. The 2025 calendar year is marked by the kick off of several of these Bond projects, which will make improvements to parks and recreation, transportation, public safety and affordable housing. Mid-Year Infrastructure Update 2025 Photo Gallery Read on to learn about infrastructure improvements throughout the community so far in 2025 and to find out what's in store for the upcoming fiscal year. Note: The projects highlighted in this article offer a glimpse into key milestones, but they don't represent every active City project or imply a ranking of importance. Projects completed so far in 2025: Azalea Road temporary road and traffic signal, restored access to the Gashes Creek neighborhood and WNC Nature Center Patton Avenue Sidewalk and Accessibility Improvements Roger Farmer Park Sport Court Improvements Construction kicked off so far in 2025: New Haw Creek Sidewalk Roof Replacement at 29 Haywood Street Roof Replacements at Thomas Wolfe Auditorium and Municipal Building (Storm Recovery) Burton Street Community Center Playground and Outdoor Improvements Old Toll Road Landslide Recovery Project Construction to start in 2025: Airport Road Sidewalk Johnston Boulevard Sidewalk Municipal Building Structural Repairs Parking Garage High Priority Improvements Shiloh Bus Shelter Shiloh Park Culvert Lining W. Patton Avenue Sidewalk Weaver Park Trail, Ballfield and Playground Improvements 12.3 miles of roadway planned to be resurfaced, roughly 2.6 miles of which are GO Bond funded* Small waterline replacement projects - citywide, ongoing Projects to enter design phase in 2025/2026: Azalea Parks and Infrastructure Recovery Biltmore Village Lighting Recovery French Broad Riverfront Parks Recovery Boosting the Block Lexington Avenue Sidewalk Improvements* Livingston Street Improvements London Road Sidewalk Improvements* Malvern Hills Park Pool* Municipal Golf Course Front 9 Restoration Oakley Public Safety Complex* Reed Creek Greenway Northern Extension* Linwood Crump Shiloh Community Center Upgrades* Walton Street Park* Permanent pretreatment systems at North Fork and DeBruhl water treatment plants - Helene Recovery Alternate bypass at North Fork water treatment plant - Helene Recovery Small waterline replacement projects - citywide, ongoing 31 sidewalk ramps planned to be updated or installed to meet ADA compliance Public Works E-Building Culvert Lining Other milestones so far in 2025: Coxe Avenue Complete Street Open House Ribbon Cutting for Memorial Stadium Phase 2 McCormick Field construction is on track and 2025 Tourists season is live WNC Nature Center Gateway to the Appalachians project nears completion Carter-Ann-Patton Stormwater Improvements project nears completion Nasty Branch Greenway has entered the review phase with North Carolina Department of Transportation; construction start planned for 2026 289 potholes were filled on City streets by Public Works crews 15 sinkholes were repaired on City streets by Public Works crews 11 sidewalk ramps were added or updated to meet ADA compliance Stay informed & provide input Watch a presentation on infrastructure investments from the City Council Meeting on June 10, 2025, listed on the agenda under Manager's Report. Track project spending and progress on the Capital Projects Spending Dashboard. Subscribe for updates on individual projects by visiting project pages. *projects with an asterisk(*) are 2024 voter-approved general obligation bond projects. ------------------------------------------------------------------------------- Construct Clingman Forest and Nasty Branch Greenways County : Buncombe Route : Riverway Multi-modal Network Length (Miles) : 0.71 Mode : Highway As of August 23, 2025, the project is in Final planning status. Anticipated letting Year is 2025 NC DOT - Construct Clingman Forest and Nasty Branch Greenways *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.
Final Planning
Roads / Highways
$4,267,000.00
Public - State/Provincial
Paving, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
November 3, 2025
To Be Determined, Asheville, NC
Related To This Project
Asheville, NC
--
Asheville, NC
--
Asheville, NC
--
Asheville, NC
--
Asheville, NC
--
Asheville, NC
--
Asheville, NC
--
Asheville, NC
--
Asheville, NC
--
Asheville, NC
--
Asheville, NC
--
Asheville, NC
--
Asheville, NC
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.