BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a transportation facility in Sutton, West Virginia. Completed plans call for site work for a transportation facility.

Bids shall be accompanied by a certified check or bid bond payable to the Braxton County Airport Authority, Sutton, West Virginia, in an amount not less than five percent (5%) of the total amount of the Base Bid and Additive Alternates. The Authority has established a Disadvantaged Business Enterprise (DBE) Program in accordance with the requirements of the U.S. Department of Transportation (DOT). As a recipient of funding from the DOT, the Authority signed an assurance to comply with the provisions of 49 CFR Part 26, "Participation by Disadvantaged Business Enterprise in DOT Programs." This project, due to the amount of federal participation, requires the Contractor to meet a goal for Disadvantaged Business Enterprise participation of 3.2 percent (3.2%). The Contractor will be required to justify the amount of DBE participation which will be utilized or that there was a good faith effort made to allow for DBE participation. It is the policy of the Authority that DBE's, as defined in 49 CFR Part 26, shall have the maximum opportunity to participate in the performance of contracts assisted in whole or part by funds granted by the DOT. The Owner's award of this contract is conditioned upon Bidder or Offeror satisfying the good faith effort requirements of 49 CFR 26.53. As a condition of bid responsiveness, the Bidder or Offeror must submit the following information with their proposal on the forms provided herein: (1) The names and addresses of Disadvantaged Business Enterprise (DBE) firms that will participate in the contract; (2) A description of the work that each DBE firm will perform; (3) The dollar amount of the participation of each DBE firm listed under (1) (4) Written statement from Bidder or Offeror that attests their commitment to use the DBE firm(s) listed under (1) to meet the Owner's project goal (5) Written confirmation from each listed DBE firm that it is participating in the contract in the kind and amount of work provided in the prime contractor's commitment; and (6) If Bidder or Offeror cannot meet the advertised project DBE goal, evidence of good faith efforts undertaken by the Bidder or Offeror as described in appendix A to 49 CFR part 26. The documentation of good faith efforts must include copies of each DBE and non-DBE subcontractor quote submitted to the bidder when a non-DBE subcontractor was selected over a DBE for work on the contract. The Braxton County Airport Authority, in accordance with the provisions of Title VI of the Civil Rights Act of 1964 (78 Stat. 252, 42 USC 2000d to 2000d-4) and the Regulations, and 49 USC 47123, FAA Order 1400.11, hereby notifies all Bidders or Offerors that it will affirmatively ensure that any contract entered into pursuant to this advertisement, disadvantaged business enterprises will be afforded full and fair opportunity to submit bids in response to this invitation and no businesses will be discriminated against on the grounds of race, color, national origin (including limited English proficiency), creed, sex (including sexual orientation and gender identity), age, or disability in the consideration for an award. The installation will consist of removing all of the existing AWOS components and installation of new components and software in n the existing exterior infrastructure, tower, and terminal facility. The project will also include mobilization and any other appurtenances required for a complete project detailed by the plans and specifications prepared by Chapman Technical Group. The Braxton County Airport Authority reserves the right to reject any and all bids. The Contractor will be required to achieve Substantial Completion within 90 calendar days and final completion and readiness for final payment within 120 calendar days of the effective date of the Notice to Proceed. Liquidated damages will be $400.00 per day for each day after the expiration of the construction time. Question Deadline 04/10/2024

Bid Results

Transportation Terminals

$179,800.00

Public - County

Site Work

10

14

8

5

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
127
Active Projects
50
Bidding Soon
644
All Active Projects
352
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

April 17, 2024

May 17, 2024

September 14, 2024

img_map_placeholder

25 Airport Rd, Sutton, WV

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.