BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 12, 2024 at 8:00 PM

Updated June 13, 2024

Site work for a water / sewer project in Pleasant Grove, Utah. Completed plans call for site work for a water / sewer project.

**As of June 12 , 2024 project is not yet awarded . No definite date for the award.** Remove and dispose existing diversion structure and appurtenances. Construct Diversion structure with specialty coanda screens and gates. Construct vaults and Install piping and meters. This project will remove the old concrete structures that exist on the river where the river exists the canyon. The project will then install the new concrete diversion structure that will divert river flows into 10 separate pipes that will convey metered water to the three irrigation districts. Extra water will be sent over Coanda screens that will then make its way down the existing American Fork River. The project has an optional alignment that American Fork River flows may be dammed and piped around the project for the duration of the project. Potential staging areas are also shown on the plans. This is an NRCS partially funded project with Pleasant Grove City as the Sponsor. There are three irrigation companies that will be the primary beneficiaries of the project. Those three companies are American Fork Irrigation Company, Lehi Irrigation Company, and Pleasant Grove Irrigation Company. Question Deadline 04/10/2024 at 5:00 PM MT

Bid Results

Water / Sewer

$9,911,900.00

Public - City

Site Work

69

29

8

3

Subscribe For Documents

19 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
153
Active Projects
72
Bidding Soon
994
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 17, 2024

May 17, 2024

Project location map

Multiple Locations, Pleasant Grove, UT

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.