Find the next project before your competition does.

See pricing

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published November 16, 2026 at 7:00 PM

Updated November 21, 2026

Site work for a water / sewer project in Pleasant Grove, Utah. Completed plans call for site work for a water / sewer project.

As of November 16, 2026, this project is complete. Remove and dispose existing diversion structure and appurtenances. Construct Diversion structure with specialty coanda screens and gates. Construct vaults and Install piping and meters. This project will remove the old concrete structures that exist on the river where the river exists the canyon. The project will then install the new concrete diversion structure that will divert river flows into 10 separate pipes that will convey metered water to the three irrigation districts. Extra water will be sent over Coanda screens that will then make its way down the existing American Fork River. The project has an optional alignment that American Fork River flows may be dammed and piped around the project for the duration of the project. Potential staging areas are also shown on the plans. This is an NRCS partially funded project with Pleasant Grove City as the Sponsor. There are three irrigation companies that will be the primary beneficiaries of the project. Those three companies are American Fork Irrigation Company, Lehi Irrigation Company, and Pleasant Grove Irrigation Company. Question Deadline 04/10/2024 at 5:00 PM MT

Occupancy

Water / Sewer

$9,911,900.00

Public - City

Site Work

69

29

8

3

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
146
Active Projects
47
Bidding Soon
1,224
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 17, 2024

May 17, 2024

Project location map

Multiple Locations, Pleasant Grove, UT

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed