BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 14, 2025 at 7:00 PM

Updated February 15, 2025

Site work and paving for a transportation facility in Dover Air Force Base, Delaware. Completed plans call for site work for a transportation facility; and for paving for a transportation facility.

The project consists of providing all labor, materials, and equipment necessary to repair a portion of Runway 14/32 pavement (see location below). The project consists of providing all labor, materials, and equipment necessary to repair 2100 LF Runway 14/32. A. Rotor mill an area 150 LF x 2100 LF to a depth of 2 inches. B. Repave 150 LF x 2100 LF with 2 inches PG 76-22 binder FAA Mix in accordance with UFC 3-260-02. Groove new pavement in in accordance with UFGS 32 01 18.71(Grooving of Airfield Paving). C. Crack seal 4200 LF (2100 LF x 2) 25 FT wide shoulder areas D. Restripe all demolished stripes/markings with retroreflective (Type 1 or Type III beads) & white paint. Markings consists of 11 - 120 LF long arrows. Questions resulting from site visit must be submitted via email to the POC below by 1:00 PM EST, 13 January 2025. Question Deadline 01/29/2025 at 1:00 PM ET The project magnitude is between $500,000 and $1,000,000. Contract performance period is 60 calendar days. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Post-Bid

Transportation Terminals

$1,000,000.00

Public - Federal

Paving, Site Work

1

5

12

3

Subscribe For Documents

17 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
476
Active Projects
216
Bidding Soon
2,967
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 14, 2025

April 15, 2025

Project location map

442 13th St, Dover Air Force Base, DE

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.