Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work for a bridge / tunnel in Topeka, Kansas. Conceptual plans call for site work for a bridge / tunnel.
Shawnee County Board of County Commissioners has authorized the issuance of a "Request for Qualifications" from qualified consulting engineering firms interested in providing professional design and construction engineering services for Shawnee County Bridge Replacement Project S-121064.00: NW 35th Street Bridge over a Tributary to Little Soldier Creek (located 0.8 miles west of NW Brickyard Road). NBI #000890991204225 Shawnee County Bridge OSN 165 SCOPE OF WORK Prepare Concept Plans, Field Check Plans, Utility Field Check Plans, Office Check Plans and Final Plans, Cost Estimates, and Bidding Documents. Prepare Right-of-Way Plans and Legal Documents for the Appraisal and Acquisition of necessary easements. Secure Certificates of Title for those properties from which permanent and/or temporary construction easements will be required. Provide field survey staking for easements to be appraised and acquired. Prepare a Geotechnical Engineering Report for the substructure elements of the proposed bridge. Prepare and submit all necessary applications for permits required by the Corps of Engineers, State of Kansas Department of Agriculture, Division of Water Resources and any other Federal or State Agency with permitting authority over rivers and streams in the State of Kansas. Assist the Shawnee County Department of Public Works with Utility Coordination as defined in the Shawnee County Design Criteria, latest edition. Provide Construction Engineering Services Plans shall be prepared in accordance with City of Topeka / Shawnee County Standard Technical Specifications, latest edition and addenda thereto and KDOT Design Standards for Bridges, latest edition. Construction Administrative, Testing and Inspection Services shall be provided in accordance with Shawnee County GENERAL CONDITIONS. Project Milestones: If the project is not selected for participation in the KDOT Off-System Bridge Program for FFY 2025, Shawnee County will let the project in early December 2024 and administer construction in 2025. Notice to Proceed April 2024 Preliminary Concept Plans and Cost Estimates May 2024 Field Check Plans & Cost Estimate to SNCO July 2024 Field Check Utility Plans to Utility Companies July 2024 Right-of-Way Plans and Documents to SNCO August 2024 Permits Submitted to Corps of Engineers & KS DWR August 2024 Office Check Plans and Cost Estimate to KDOT / SNCO September 2024 Final Plans, Bidding Documents and Engineers Estimates to SNCO & SNCO Purchasing October 2024 SNCO Bid Letting December 2024 Construction Start Work March 2025 Construction Substantial Completion August 2025
Conceptual
Bridges / Tunnels
$600,000.00
Public - County
Site Work
We’ve obtained documents for this project and are currently processing them.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 31, 2025
NW 35th St, Topeka, KS
Related To This Project
Topeka, KS
Bid Date: Apr 17 2024
Topeka, KS
Bid Date: Apr 17 2024
Topeka, KS
--
Topeka, KS
Bid Date: May 02 2024
Topeka, KS
Bid Date: Apr 17 2024
Topeka, KS
Bid Date: Apr 23 2024
Topeka, KS
Bid Date: Apr 17 2024
Topeka, KS
--
Topeka, KS
--
Topeka, KS
Bid Date: Mar 28 2024
Topeka, KS
Bid Date: Mar 28 2024
Topeka, KS
Bid Date: Mar 28 2024
Topeka, KS
Bid Date: Apr 05 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.