BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a detention facility in Gaffney, South Carolina. Completed plans call for the renovation of a detention facility.

Mitigation and Reconstruction of A,B, and E Unit Bathroom Ceilings at Cherokee County Detention Center. Location of projects is 315 E. DR. LM Rosemond Ln, Gaffney, SC 29340. Cherokee County is seeking experienced, qualified vendors who specialize in mitigation and reconstruction of bathroom ceilings in three units at the Cherokee County Detention Center. . Questions regarding this RFP must be submitted in writing directly to Abi Reid, abi.reid@cherokeecountysc.com Bathroom Block A Bathroom Block A Height: 8' 5/8" drywall - hung, taped, floated, ready for paint Tear out wet drywall, cleanup, bag - Clean floor - Clean toilet - Heavy Seal/prime then paint the walls and ceiling twice (3 coats) Water extraction from hard surface floor - Cat 3 water Clean more than the walls and ceiling - Apply anti-microbial agent to all surfaces Clean sink Containment Barrier Peel & seal zipper - Containment Barrier/Airlock/Decon. Chamber Add for HEPA filter (for negative air exhaust fan) Negative air fan/Air scrubber (24 hr period) - No monit. 7.00 DA R&R Cold air return cover - Detach & Reset Fluorescent light fixture Clean register - heat / AC Ducting - lay-flat - Dehumidifier (per 24 hour period) - Equipment decontamination charge - Mask and cover large light fixture Mask wall - plastic, paper, tape (per LF) Clean floor - Heavy 79.92 SF Clean the walls and ceiling - Heavy 351.25 SF Apply anti-microbial agent to all surfaces 431.17 SF Bathroom Block B Bathroom Block B Height: 8' 5/8" drywall - hung, taped, floated, ready for paint Tear out wet drywall, cleanup, bag - Clean floor - Clean toilet - Seal/prime then paint the walls and ceiling twice (3 coats) Water extraction from hard surface floor - Clean more than the walls and ceiling - Clean sink - Floor protection Containment Barrier - Peel & seal zipper - Add for HEPA filter (for negative air exhaust fan) Negative air fan/Air scrubber R&R Cold air return cover - R&R Cold air return cover - Detach & Reset Fluorescent light fixture Clean register - heat / AC Ducting - lay-flat - Dehumidifier Equipment decontamination charge Mask and cover large light fixture Mask wall - Apply anti-microbial agent to all surfaces Shower Block B Height: 8' Clean floor - Clean the walls and ceiling - Apply anti-microbial agent to all surfaces Bathroom Block Echo Echo Bathroom Height: 8' 5/8" drywall - hung, taped, floated, ready for paint Tear out wet drywall, cleanup, bag - Clean floor - Clean toilet - Seal/prime then paint the walls and ceiling twice (3 coats) Water extraction from hard surface floor - Add for HEPA filter Negative air fan/Air scrubber R&R Cold air return cover - R&R Cold air return cover - Detach & Reset Fluorescent light fixture Clean register - heat / AC Ducting - lay-flat - Dehumidifier Mask and cover large light fixture Mask wall Apply anti-microbial agent to all surfaces Dumpster load - Approx. 20 yards, 4 tons of debris man hours to transport debris from cell blocks through three security doors to dumpster Respirator cartridge - HEPA only Respirator - Full face - multi-purpose resp. 3 respirators for approximately 20 days of work each Plastic bag - for hazardous material cleanup - all contaminated debris will be double bagged in thick 3 mil bags, zip tied and vacuumed before being brough out of the decontaminated area On-Site Evaluation and/or Supervisor/Admin - Eye protection - plastic goggles - Personal protective gloves - Disposable coveralls w/hood and boots - Final cleaning of each block, 3 men 2 hours each per block Final Inspection

Award

Jails / Prisons

$100,000.00

Public - County

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
118
Active Projects
57
Bidding Soon
1,087
All Active Projects
523
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 6, 2024

June 5, 2024

img_map_placeholder

315 W Drive L M Rosemond Ln, Gaffney, SC

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.