BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work, paving and outdoor lighting for a mixed-use development in Montague, Massachusetts. Working plans call for site work for a road / highway; for outdoor lighting for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

**As of April 22, 2024. Project will go on rebid. No definite date for the rebid.** Avenue A Streets cape Phase IV Continuation Project consists of reconstruction of sidewalks, brick work, granite planters, site amenities, street lighting, and electrical service on the northwest side of Avenue A between 3rd Street and 1st Street and in front of Town Hall building at 1st street, replanting of granite planters between the 2nd Street alley and 1st Street alley on the southeast side of Avenue A, and replacement of traffic mast arms at the 3rd Street intersection in downtown Turners Falls, MA. Bid Forms and Contract Documents will be available for pick-up at www.biddocsonline.com (may be viewed electronically and hard copy requested) or at Nashoba Blue, Inc. at 433 Main Street, Hudson, MA 01749 (978-568-1167). A pre-bid site visit is scheduled for MARCH 26, 2024 at 2:00 PM located at the Montague Town Hall, 1 Avenue A, Turners Falls, MA 01376. The work is estimated to cost $1,325,000 MBE AND WBE PARTICIPATION (not applicable) The Agreement will include a stipulation that the Work be sustainably completed within 180 calendar days from the date of contract and all closeout documentation must be submitted by November 1 2024 SCOPE OF WORK Furnish all lobar materials plant, equipment and services necessary for and reasonably incidental to the complete installation of all electrical work specified herein and or indicated on the drawings including but not limited to the following Branch circuit wiring conduit, and raceway Luminaries lamps and poles Wiring Devices and Plates Modifications to existing load center Demolition removal from site and legal disposal of all existing electrical systems and equipment made obsolete by new construction. It should be assumed that all light fixture ballasts contain PCB s. Arrange for Inspections and Perform Tests. Guarantee and Instructions New Service. The Contractor shall perform all the Work required by the Contract Documents for the Avenue A Streets cape Phase IV Continuation Project prepared by Berkshire Design Group Inc dated March 20 2024 acting as the Landscape Architect Engineer and referred to in these Contract Documents as the Landscape Architect Engineer

Final Planning

Sidewalks / Parking Lot

$1,325,000.00

Public - City

Outdoor Lighting, Paving, Site Work

18

13

4

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
364
Active Projects
221
Bidding Soon
2,980
All Active Projects
1,345
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 10, 2024

October 22, 2024

img_map_placeholder

Avenue A, Montague, MA


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.