BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of an educational facility in Kirkland Lake, Ontario. Completed plans call for the renovation of a educational facility.

Reference Number 0000266749 Pricing Lump sum Deadline for Questions - April 10th, 2024 @ 10:00 a.m. The Scope of the Welding Shop Cladding Upgrades Work at the Existing Campus Generally Includes, but is Not Necessarily Limited to, the Following: .1 Installation of All Engineered Shoring and Temporary Bracing Required to Protect Existing Structure During Removals and Alterations, Until Permanent Supports, Lintels and the Like Are in Place; 2 Localized Sequential Demolition, Removals and Alterations to Existing Building, Including Removal of Existing Face Brick Cladding and Cavity Wall Insulation as Indicated on Drawings and/or Specified, and to Carry Out Alterations to the Existing Building Cladding Systems, Including Reinforcing of Existing Exterior Masonry Walls as Indicated; .3 Installation of New Masonry Face Brick, Prefinished Metal Wall Panels, Insulation, and Membrane Air Vapour Barrier at Existing Exterior Wall Assemblies, as Detailed, Including New Single Ply Pvc Membrane Flashings at Existing Parapets; 4 Installation of New Insulated Glazed Overhead Door and Electric Operator; .5 Installation of New Hollow Metal Doors, Frames and Hardware, as Scheduled; .6 Careful Removal, Salvage, and Reinstatement of Existing Security System Cameras; .7 Installation of New Exterior Wall Mounted Light Fixture; and .8 Localized Site Remediation, as Required, to Suit Each bidding General Contractor shall submit, and enclose with its Tender, a Bid Bond issued by an approved Surety Company, authorized to transact the business of suretyship in the Province of Ontario, in favour of the Owner, in the amount of Ten Percent (10%) of the Stipulated Sum Tendered together with an original Agreement to Bond or consent of surety, issued by the same Surety. Performance Bond: 50% of the Stipulated Sum Contract. Labour and Material Payment Bond: 50% of the Stipulated Sum Contract. Documents can be obtained at https://northernc.bonfirehub.ca/

Award

Educational

$548,900.00

Public - State/Provincial

Renovation

10

13

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
6
Active Projects
3
Bidding Soon
53
All Active Projects
22
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 16, 2024

May 16, 2024

img_map_placeholder

140 Government Rd E, Kirkland Lake, ON


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.