BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published November 14, 2024 at 7:00 PM

Updated June 14, 2025

Site work and paving for a road / highway in Belmont, North Carolina. Working plans call for site work for a road / highway; and for paving for a road / highway.

The project, I-5719B / U-5800, widens I-85 to an eight-lane facility from NC 7 (Exit 23) to east of NC 273 (Exit 27) and intersection improvement at NC 7 (Main Street) and US 29 / 74 (Wilkinson Boulevard) in Belmont. Technical questions related to the RFQ package, or other project related questions, must be sent, by e-mail only, to altdelivery@ncdot.gov. For tracking purposes, questions will only be answered through e-mail requests. When making requests by e-mail, it is advisable to request a return receipt for your records. NC DOT - RFQ D/B - I-85 Widening and Intersection Improvements Anticipated Scope of Work In general, the I-5719 / U-5800 / U-6044 Design-Build Project adds lanes to I-85 from US 321 (North Chester Street - Exit 17) to east of NC 273 (Beatty Drive - Exit 27), improves the NC 7 (Main Street) and US 29 / 74 (Wilkinson Boulevard) intersection in Belmont, and widens SR 2200 (Cox Road) from I-85 to US 29 / 74 in Gaston County. The approximately 10.5-mile project provides an eight-lane divided facility along I-85. The project also reconstructs approximately 0.7 miles of railroad for Piedmont and Northern Railway. The purpose of this project is to reduce congestion and improve mobility along I-85 and improve traffic operations and safety at the NC 7 (Main Street) and / US 29 / 74 (Wilkinson Boulevard) intersection, and along SR 2200 (Cox Road) from I-85 to US 29 / 74, and the SR 2200 (Cox Road / Armstrong Park Road) / US 29 / 74 (East Franklin Boulevard) intersection. Anticipated Design-Build Procurement Schedule March 2024 - Request for Qualifications April 2024 - Announcement of Short-listed Teams and first industry draft RFP August 2024 - Final Request for Proposals October 2024 - Technical Proposals Due to NCDOT November 2024 - Letting Shortlist Confirmed

Final Planning

Roads / Highways

$8,900,000.00

Public - State/Provincial

Paving, Site Work

2293

4

5

3

Subscribe For Documents

25 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Execution and Closeout Requirements, Examination and Preparation
Division 09 - Finishes

Division 09 - Finishes

Painting and Coating
Division 11 - Equipment

Division 11 - Equipment

Vehicle and Pedestrian Equipment, Parking Control Equipment, Loading Dock Equipment
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Detection and Alarm, Fuel-Gas Detection and Alarm
Division 31 - Earthwork

Division 31 - Earthwork

Earth Moving, Erosion and Sedimentation Controls
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Planting
Division 34 - Transportation

Division 34 - Transportation

Transportation

Find More Local Projects

Within 75 Miles of This Project
214
Active Projects
117
Bidding Soon
1,933
All Active Projects
953
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 1, 2024

June 2, 2025

img_map_placeholder

Multiple Locations, Belmont, NC

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.