BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Petersburg, West Virginia. Completed plans call for site work for a transportation facility; and for paving for a transportation facility.

The scope of the project includes rehabilitating the existing asphalt Taxiways and Main Apron pavement surfaces, milling and paving the Fuel Farm Apron, constructing a concrete fueling pad, and demolition of a concrete slab at the Grant County Airport located near Petersburg, West Virginia. The Taxiways B, C, D, E, F and G will consist of removing the existing airfield pavement markings to prevent shadowing, cleaning the surface of all deleterious material, repairing existing cracks and joints, placing an emulsified asphalt seal coat, and placing the airfield pavement markings. The emulsified asphalt seal coat will be applied in one (1) coat. The Main Apron rehabilitation will consist of removing the existing airfield pavement markings to prevent shadowing, cleaning the surface of all deleterious material, repairing existing cracks and joints, placing a refined coal tar emulsion surface treatment, and placing the airfield pavement markings. The refined coal tar emulsion surface treatment will be applied in two (2) coats. The milling of the FuelFarm Apron will include milling the existing top 2” of the asphalt pavement surface, full depth pavement repair as required, and placing 2” of HMA WVDOT The bid prices shall include the costs for furnishing labor and materials and performing all work set forth in the Advertisement for Bids, Information for Bidders, Form of Proposal, Standard General Conditions of the Constructio Contract, Supplemental General Conditions and Detail Specifications and Drawings prepared by Chapman Technical Group. Immediately following the scheduled closing time for the reception of bids, all proposals which have been submitted in accordance with the required provisions will be publicly opened and read aloud. The Grant County Airport Authority reserves the right to reject any and all bids. Construction Time Limits - The Contractor will be required to achieve Substantial Completion within 60 calendar days and final completion and readiness for final payment within 90 calendar days of the effective date of the Notice to Proceed. Liquidated damages will be $400.00 per day for each day after the expiration of the construction time. Bids shall be accompanied by a certified check or bid bond payable to the Grant County Airport Authority, Petersburg, West Virginia, in an amount not less than five percent (5%) of the total amount of the Base Bid and Additive Alternates.

Bid Results

Transportation Terminals

$145,732.00

Public - County

Paving, Site Work

16

9

8

4

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
129
Active Projects
55
Bidding Soon
803
All Active Projects
345
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

April 16, 2024

June 17, 2024

September 15, 2024

img_map_placeholder

Airport Rd, Petersburg, WV

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.