BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a civil project in Everett, Washington. Completed plans call for site work for a bridge / tunnel.

The deck rehabilitation includes removing and replacing an existing overlay with a new polyester concrete overlay on the eastbound lanes of the Viaduct structure as well as minor drainage improvements and bridge deck repair on the westbound lanes. The City of Seattle, in accordance with Title VI of the Civil Rights Act of 1964, 78 Stat. 252, 42 U.S.C. 2000d to 2000-4) and the Regulations, hereby notifies all Bidders that it will affirmatively ensure that in any contract entered into pursuant to this advertisement, Disadvantaged Business Enterprises will be afforded full opportunity to submit Bids in response to this invitation and will not be discriminated against on the grounds of race, color, or national origin in consideration for an Award. The deck rehabilitation includes removing and replacing an existing overlay with a new polyester concrete overlay on the eastbound lanes of the Viaduct structure as well as minor drainage improvements and bridge deck repair on the westbound lanes. A/E ESTIMATE: $7,800,000 to $8,200,000 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. There is no pre-bid site inspection meeting scheduled for this project. : Bidders must understand the requirements of SMC 19.19, RCW 49.46, 29 CFR 5.5 and 40 USC 3141 and demonstrate compliance prior to award. : This Contract has a 13% mandatory goal. Note: City of Seattle Inclusion Plan requirements are not applicable on FHWA funded projects. Work shall begin immediately on the Notice To Proceed Date in the Written Notice from the Engineer and after the date of such notice shall be physically completed within the following period per Section 3 of the Agreement: 39 WORKING DAYS IV. LIQUIDATED DAMAGES If the successful Contractor fails to complete Work within the time set forth above, (s)he shall be charged Liquidated Damages per Section 4 of the Agreement and Section 1-08.9. See Section 1-08.9 for method for determining cost of liquidated damages.

Bid Results

Bridges / Tunnels

$7,452,478.00

Public - City

Site Work

199

16

12

3

Subscribe For Documents

54 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
103
Active Projects
34
Bidding Soon
940
All Active Projects
397
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 17, 2024

June 17, 2024

img_map_placeholder

Spokane Dr, Everett, WA


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.