Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Demolition, site work, paving and new construction of a mixed-use development in Saint Cloud, Minnesota. Completed plans call for the construction of a 11,186-square-foot medical facility; for the demolition of a medical facility; for site work for a medical facility; sidewalk / parking lot; for paving for a sidewalk / parking lot; and water / sewer project.
The St. Cloud VAMC is seeking a general contractor to construct a new PACT clinic on the first floor of building 4. Work includes general construction, not all-inclusive, to perform abatement, demolition, removal or relocation of existing structures, relocation of existing utilities, alterations, grading, drainage, site utilities, curbs, walks, pavement, stormwater management systems, architectural, structural, mechanical and electrical work. Adjacent corridor of Building 4, basement of Building 4, adjacent first floor of Building 4, second floor of Building 4, all spaces of Building 5, and all spaces of Building 1 will remain occupied by the VA throughout the construction phasing. Work affecting occupied areas may need to be accomplished outside of normal working hours if noise, dust, and other hazards cannot be satisfactorily mitigated. Coordination with other construction projects may be required during construction phasing. This work includes, but is not limited to: Demolition: Contractor to demolish current kitchen coolers, equipment and infrastructure on the first floor as required to complete the infill of the courtyard and the first-floor remodel. The remainder of the first-floor space involved in this scope, outside of the vacated kitchen space, is an office and general circulation space. The contractor shall remove from the VA site and dispose of all equipment and materials not scheduled to be reused. Questions of a technical nature must be provided in writing and shall be submitted by the prospective offerors to Brett Meister and Jason Schultz. Questions shall be submitted only via email to: Brett.Meisterva.gov and Jason.Schultzva.gov. The subject line must read: St. Cloud - Construct PACT Clinic Building 4 - Technical Questions. Oral questions of a technical nature are not acceptable due to the possibility of misunderstanding or misinterpretation. THE CUT-OFF DATE AND TIME FOR RECEIPT OF QUESTIONS IS 07/24/2024 at 2:00 PM ET The contractor shall provide all tools, equipment, materials, labor, supervision, personnel, and shall do all things necessary that will result in the completion of the Patient Aligned Care Team (PACT) Clinic Building 4 First Floor construction project, in accordance with the attached Specifications and Drawings. The Contractor shall begin performance within 10 calendar days and complete it within 581 calendar day The value of VAAR Construction magnitude for the entire project is between $10,000,000.00 and $20,000,000.00 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
Post-Bid
Medical
$20,000,000.00
Public - Federal
Demolition, New Construction, Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 13, 2024
October 14, 2024
4801 Veterans Dr, Saint Cloud, MN
Related To This Project
Saint Cloud, MN
--
Saint Cloud, MN
Bid Date: Apr 25 2024
Saint Cloud, MN
--
Saint Cloud, MN
Bid Date: May 01 2024
Saint Cloud, MN
Bid Date: Mar 25 2021
Saint Cloud, MN
Bid Date: Jun 12 2024
Saint Cloud, MN
Bid Date: Jun 04 2024
Saint Cloud, MN
Bid Date: Jul 15 2024
Saint Cloud, MN
Bid Date: Oct 31 2024
Saint Cloud, MN
Bid Date: Mar 14 2024
Saint Cloud, MN
Bid Date: Mar 21 2024
Saint Cloud, MN
Bid Date: Mar 12 2024
Saint Cloud, MN
Bid Date: May 29 2019
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.