Site work and paving for a mixed-use development in Jamestown, Missouri. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

Remove existing sidewalk, curbs, and stairs to achieve proposed work as outlined in drawings and scope below. Install sidewalks, curbs, stairs, railings, and other site improvements per the attached details. Remove all debris from demolition from site, provide and lay topsoil, grade to new improvements, and seed and straw. Color to be coordinated with owner as close to adjacent stone material as possible. Ramp handrail be 3'-0" above ramp along slope and extend horizontally 1-0" at head and toe of ramp. Color and material to match stair rails. Prebid: (Optional) March 26, 2024 Bids Due: April 4, 2024 at 1:00 p.m. at the Superintendent's office at Jamestown C-1. Be sure to list Base Bid (Includes all work shown), Deductive Alternate #1, Deductive Alternate #2, Deductive Alternate #3(Stone Walls), and Deductive Alternate #4(Metal Railings). Grades shown are approximations and should be used for rough take-off only. Verify and match existing asphalt paving gradesin field. The worksite should be kept clean at all times and existing asphalt paving should be protected from damage. Damage to existing paving to remain will need to be repaired at General Contractors' expense. Photos will be taken of the area of work on the day construction is to begin and shared with the General Contractor for reference. Deductive Alternate #1: Install approximately 160' of 5'-6" concrete sidewalk and turn down curb and gutter per detail B1 on Sheet D1 along East wall of Gymnasium from new entry stairs North to 90-degree sidewalk turn. Along this walk, (4) gutter transitions will need to be installed per detail C1 on sheet D1. All questions should be submitted to Dr. Gretchen Guitard@guitardg@jamestown.k12.mo.us. C.D. General Contractor shall visit thesite and measure the extent of allwork proposed. Owners rep. will beavailable on March 26, 2024 to answer any question and visit aboutsite conditions.

Post-Bid

Roads / Highways

$250,000.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
40
Active Projects
24
Bidding Soon
328
All Active Projects
127
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 4, 2024

May 6, 2024

img_map_placeholder

To Be Determined, Jamestown, MO

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.