BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a road / highway in Oregon, Illinois. Completed plans call for site work for a road / highway; and for paving for a road / highway.

Proposed Improvement on 04/05/24 Date Project Length . 1.5" Hma Surface Course, Bituminous Materials (Tack Coat), Hma Surface Removal - Butt Joints and Traffic Control. Insurance: the Successful Bidder Shall Furnish a Certificate of Insurance in the Requirements Listed, Within 30 Days of Award or the Contract is Null and Void. 1. Bodily Injury Liability $1,000,000.00 2. Property Damage Liability a. Each Occurrence $500,000.00 3. Workman's Compensation Coverage Quantities: Quantities Are Estimates Prepared for the Establishment of Pay Items and Are the Responsibility of the Contractor to Confirm Prior to Bidding. Quantities May Be Increased, Decreased, or Omitted to Satisfactorily Complete the Project. Bituminous Materials (Tack Coat): Asphalt Ss-1h Shall Be Used for Bituminous Materials (Tack Coat). Initial Applications on Recycled Bituminous Surfaces Shall Be Applied at a Rate of 0.030 Lbs/sf, or to the Satisfaction of the Engineer. This Work Shall Be Paid for at the Contract Price Per Pound for Bituminous Materials (Tack Coat) Hot-mix Asphalt Surface Course: Mixture Requirements for All Roads the Following Mixture Requirements Are Applicable for This Project: Location: Surface Pg: 58-28 Design Air Voids: 4.0% @ N-50 Mixture Composition (Gradation Mixture): Il9.5 Friction Aggregate: C Minimum Daily Tons Placed on the Road Shall Be 500 Tons or the Completion of at Least One Location. the Nominal Compacted Thickness of Hot-mix Asphalt Surface Course Placed Shall Be 1.5" Average. The Hotmix Asphalt Surface Course Shall Be Produced From One (1) Plant Only. Cost of Sweeping and Cleaning the Existing Bituminous Surface Shall Be Included in the Contract Unit Price for Hot-mix Asphalt Surface Course. All Private Drives Shall Be Paved According to the Enclosed Detail. Special Attention is Called to the Blr 24 Standard. Care Shall Be Taken to Keep Rolled Edges to a Minimum, Driveways With Rolled Edges Along the Roadside Edge Shall Be Saw Cut as Directed by the Engineer. the Density Requirement Shall Be According to the Hot-mix Asphalt Density (Growth Curve) Special Provision Included. This Work Shall Comply With Section 406 of the Standard Specifications for Road and Bridge Construction and Shall Be Paid for at the Contract Unit Price Per Ton for Hot-mix Asphalt Surface Course. Compaction Equipment for Hot Mix Asphalt: Rollers Shall Consist of (1) Vibratory Roller, (1) Tandem Finish Roller, and (1) Pneumatic Tired Roller, Unless Otherwise Approved by the Engineer. Paving Equipment the Paver Shall Be Equipped With a Full Vibratory Hydraulic Variable Width Screed. Hot-mix Asphalt Surface Removal - Butt Joint: This Work Shall Be Done in Accordance With the Applicable Provisions of Section 406 of the Standard Specifications for Road and Bridge Construction. This Work Shall Consist of Milling the Existing Pavement in the Roadway and at the Right-of-way in Paved Entrances. Surface Removal in the Road Shall Consist of Sawing Joints at Right Angles to the Roadway and Removing the Existing Asphalt With a Roto-mill as Directed by the Engineer. the Butt Joints Shall Be the Full Width of the Pavement at Varying Depths and Lengths as Shown in the Butt Joint Details. Milling, Hauling, and Disposal of the Millings Shall Be Paid for at the Contract Price Per Square Yard for Hotmix Asphalt Surface Removal - Butt Joint. Traffic Control & Protection Traffic Control Shall Be in Accordance With the Applicable Sections of the Standard Specifications for Road and Bridge Construction, the Applicable Guidelines Contained in the National Manual on Uniform Traffic Control Devices for Streets and Highways, Illinois Supplement to the National Manual on Uniform Traffic Control Devices, These Special Provisions, and Any Details and Highway Standards Contained Herein and in the Plans. 1. Special Attention is Called to Articles 107.09 and 107.14 of the Standard Specifications for Road and Bridge Construction and the Following Standards: 701011, 701301, 701311, 701901, Blr 21-9, and Blr 22-7. 2. All Roadways Can Be Closed to Traffic During Paving Operations. Local Residents Shall Be Allowed Access in Accordance With Article 107.09 of the Standard Specifications. Signing Shall Be Furnished in Accordance With Standard Blr21-9 and Blr22-7.

Award

Roads / Highways

$134,303.00

Public - County

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

4

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
153
Active Projects
89
Bidding Soon
1,425
All Active Projects
613
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 5, 2024

May 6, 2024

img_map_placeholder

Multiple Locations, Oregon, IL

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.