Site work for a water / sewer project in Stumpy Point, North Carolina. Completed plans call for site work for a water / sewer project.
Separate sealed Bids for the construction of: 1. The project is located in Dare County, NC located approximately 2.2 miles south of the entrance to the Stumpy Point, NC community. The Stumpy Point Disposal Area is an approximate 73-acre confined disposal facility (CDF) having dimensions approximately 1,200 ft. long by 2,800 ft. wide that is currently used by the United States Army Corps of Engineers (USACE) for storing mixed and fine-grained sediments. The Stumpy Point CDF has historically been used for the placement of dredged material from the Stumpy Point Navigation Channel and Basin. A topographic survey conducted in May 2023 indicated that the elevation of the existing dike that encircles the outer perimeter of the CDF varies approximately between +8 ft. and +10 ft. NAVD88. The CDF is located on property within the Alligator River National Wildlife Refuge (ARNWR) and is owned and managed by the U.S. Fish and Wildlife Service (USFWS) and used by the USACE to contain dredged material. 2. The work is generally described as a disposal area improvement project that involves raising the elevation of the existing dike embankment that surrounds the CDF to +12 ft NAVD88, modifying the existing spillway structure, and replacing the timber walkway that connects the spillway structure to the dike. Approximately 38,800 cy of material within the CDF has been estimated to be needed for constructing the new dike embankment based on the May 2023 survey. To do so, temporary silt fence shall be installed around the outer perimeter of the project area and the footprint of the new dike will be cleared and grubbed. Material will be excavated within the proposed borrow area within the disposal area and will be transported to the outer perimeter where it will be placed upon the existing dike and graded to meet the design configuration. The design configuration of the dike embankment includes a 10 ft wide crest with 1V:3H side slopes. A virtual option will be provided for representatives of BIDDERS who wish to attend the pre-Bid conference virtually. BIDDER representatives that wish to participate virtually should request virtual meeting information via email to apriest@coastalprotectioneng.com, no later than March 25th, 2024. Those that submit an email request will receive the virtual meeting information by March 26th, 2024. The Contract Documents may be examined at the following location(s): 1. Dare County, 954 Marshall C Collins Dr., Manteo, NC 27954 2. Coastal Protection Engineering of North Carolina, Inc. (CPE), 4038 Masonboro Loop Rd. Wilmington, NC 28409 Dare County reserves the right to reject any and all proposals for any reason determined to be in the best interest of the County. Dare County is an Equal Opportunity Employer and does not discriminate. Small, minority and women's businesses and labor-surplus-area firms are encouraged to submit bids. The Work will be substantially complete on or before October 1, 2024, and completed and ready for final payment in accordance with Paragraph 15.06 of the General Conditions on or before November 1, 2024.
Post-Bid
Water / Sewer
$1,983,000.00
Public - County
Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 30, 2024
June 28, 2024
To Be Determined, Stumpy Point, NC
Related To This Project
Stumpy Point, NC
Bid Date: Aug 21 2024
Stumpy Point, NC
Bid Date: Sep 18 2024
Stumpy Point, NC
Bid Date: Oct 16 2024
Stumpy Point, NC
Bid Date: Mar 06 2024
Stumpy Point, NC
Bid Date: Jan 03 2024
Stumpy Point, NC
Bid Date: Nov 14 2023
Stumpy Point, NC
Bid Date: Dec 06 2023
Stumpy Point, NC
Bid Date: Feb 16 2022
Stumpy Point, NC
Bid Date: Jan 18 2022
Stumpy Point, NC
Bid Date: Aug 09 2023
Stumpy Point, NC
Bid Date: Sep 20 2022
Smithfield, NC
Bid Date: Mar 26 2024
Morrisville, NC
Bid Date: Apr 11 2024
Winston Salem, NC
Bid Date: Mar 22 2024
Raleigh, NC
Bid Date: Mar 27 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Get the most reliable construction project data instantly.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.