BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Portal, North Dakota. Completed plans call for site work for a water / sewer project.

Generally, the Work covered by the Plans and Specifications for Sanitary Sewer Relocation consists of the materials, labor, tools, and equipment required for the construction of new sanitary sewer. The Work includes approximately 600 LF of sewer pipe, sewer manholes, 370 Ton of gravel, and other incidentals as necessary to complete the project. Details of the construction are included in the Drawings and Project Manual. Est. Value Notes: $210-220k Should the Contractor fail to complete its obligations under the Contract within the time required herein or within such extra time as may have been granted by formal extensions of time approved by the Owner, there will be deducted from any amount due to the Contractor the sum of $500 per day for each and every calendar day that the completion of the Work is delayed. The Contractor and his Surety will be liable for any excess. Such payment will be as and for liquidated damages and not as a penalty. By order of the Council Members of the City of Portal, North Dakota. The bid security must be in a sum equal to five percent of the full amount of the bid and must be in the form of a bidder's bond. A bidder's bond must be executed by the bidder as principal and by a surety, conditioned that if the principal's bid is accepted and the contract awarded to the principal, the principal, within ten days after notice of the award, shall execute a contract in accordance with the terms of the bid and the bid bond and any condition of the governing body. A countersignature of a bid bond is not required under this section. If a successful bidder does not execute a contract within the ten days allowed, the bidder's bond must be forfeited to the Owner and the project awarded to the next lowest responsible bidder. The Owner reserves the right to hold all Bids for 30 days, to reject any or all Bids, to waive any informality or irregularity in any Bid, to accept the Bid deemed in the best interest of the Owner, and to rebid the project until a satisfactory bid is received. All work shall be substantially complete by October 11, 2024. All work shall be completed and ready for final payment in accordance with the General Conditions by October 25, 2024. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Post-Bid

Water / Sewer

$220,000.00

Public - City

Site Work

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
10
Active Projects
5
Bidding Soon
43
All Active Projects
23
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 10, 2024

May 10, 2024

img_map_placeholder

Multiple Locations, Portal, ND

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.