Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work, paving and outdoor lighting for a mixed-use development in Waukesha, Wisconsin. Conceptual plans call for site work for a playground / park / athletic field; for outdoor lighting for a playground / park / athletic field; sidewalk / parking lot; for paving for a sidewalk / parking lot; and water / sewer project.
The pathways in Frame Park (northside in particular) are experiencing damage, heaving, undercutting and potholes from annual flooding of the Fox River. A plan will be developed, and they will be reconstructed with a drainage base to help prevent future damage. The replacement of existing piers and approaches, replacement of light poles and railings, will take place in phases. The resetting of paver bricks as well as integration of stamped colored concrete, and crack-filling and sealing of asphalt pavement is needed in order to maintain maintenance standards and will also occur in phases. The Formal Gardens are a very popular spot for weddings, photo ops, and more. The pathways into the gardens are not fully ADA accessible. There are stormwater issues in and around the Formal Gardens that need to be addressed. Railings in the Barstow Plaza area experience harsh conditions from dampness of the river climate and heavy salt from the roads in the winter. The railings have been repaired and repainted and are now rusted to the point of replacement. This project is included in the city’s fy 2024-2028 Capital Improvement Program. As of April 2, 2024, further details regarding design and construction timelines have not been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.
Conceptual
Playgrounds / Parks / Athletic Fields
$1,370,700.00
Public - City
Outdoor Lighting, Paving, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 30, 2025
Frame Park Dr, Waukesha, WI
Related To This Project
Waukesha, WI
--
Waukesha, WI
--
Waukesha, WI
--
Waukesha, WI
--
Waukesha, WI
--
Waukesha, WI
--
Waukesha, WI
--
Waukesha, WI
--
Waukesha, WI
--
Waukesha, WI
--
Waukesha, WI
--
Waukesha, WI
--
Waukesha, WI
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.