Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work for a civil project in Gore, Oklahoma. Working plans call for site work for a water / sewer project.
Pre-solicitation Notice For Tenkiller Replace Draft Tube Bulkheads and Lifting Beam Tenkiller Ferry Powerhouse, Sequoyah County, OK This is a PRE-SOLICITATION NOTICE for the construction of the Tenkiller Replace Draft Tube Bulkheads and Lifting Beam project, at Tenkiller Ferry Powerhouse, Sequoyah County, Oklahoma. THIS IS NOT A SOLICITATION FOR PROPOSALS AND NO CONTRACT WILL BE AWARDED FROM THIS SYNOPSIS. No reimbursement will be made for any costs associated with providing information in response to this pre-solicitation notice or any follow up postings. The U.S. Army Corps of Engineers - Tulsa District has been tasked to solicit for and award construction project for the Tenkiller Replace Draft Tube Bulkheads and Lifting Beam project, at Tenkiller Ferry Powerhouse. This project will be an Unrestricted, firm-fixed price, construction contract procured in accordance with FAR 15, Negotiated Procurement utilizing the Lowest Price Technically Acceptable approach. Project Description: Tenkiller Ferry Dam is a multipurpose facility located on the Illinois River in Sequoyah County, Oklahoma. The earth-fill dam is primarily focused on providing flood control, recreation, and hydropower. The project is located approximately seven miles northeast of Gore, OK. The power plant contains two Francis-type generating units each rated 20,579 kVA at 0.95 pf. Construction of the site was completed in 1952 and is remotely operated from Fort Gibson powerhouse. The plant has an intake structure located over the rock cliff, approximately 750 feet away from the powerhouse. On the downstream side of the powerhouse, draft tube bulkheads are located outside the facility on the tailrace deck. Each turbine unit has two gate slots, and the Project has two draft tube bulkheads in total. A monorail mounted on the exterior wall of the powerhouse with a single 10 ton trolley hoist is used to set the draft tube bulkheads. The work includes but is not limited to: Fabrication, painting, delivery, installation, and testing (operational and leakage) of two (2) new draft tube bulkheads. Bulkheads have a nominal size of 16'-4" wide by 10' high, fabricated to comply with HSS standards and coated with 5-E-Z vinyl coating system. Design, fabrication, painting, delivery, installation, and testing of one (1) new draft tube bulkhead lifting beam. Removal and disposal of two (2) existing draft tube bulkheads and one (1) existing draft tube bulkhead lifting beam. In accordance with FAR 36 and DFARS 236, the estimated magnitude of construction for this project is between $1,000,000 and $5,000,000. The North American Industry Classification System code for this procurement is 237990 (Other Heavy and Civil Engineering Construction) which has a small business size standard of $45M. Estimated duration of construction of this project is 365 calendar days. Anticipated solicitation issuance date is on or about 03 April 2024, and the estimated proposal due date will be on or about 08 May 2024. The Method of Contractor Selection has not been determined at this Time. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
Final Planning
Water / Sewer
$5,000,000.00
Public - Federal
Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 3, 2024
100 N Main St, Gore, OK
Related To This Project
Gore, OK
Bid Date: Jul 22 2024
Gore, OK
Bid Date: Oct 17 2024
Gore, OK
Bid Date: Aug 23 2024
Gore, OK
Bid Date: Nov 14 2024
Gore, OK
Bid Date: Feb 22 2024
Gore, OK
--
Gore, OK
Bid Date: Sep 29 2022
Gore, OK
Bid Date: Feb 25 2022
Gore, OK
Bid Date: Oct 17 2023
Gore, OK
Bid Date: Oct 17 2023
Gore, OK
--
Gore, OK
Bid Date: Mar 01 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Get the most reliable construction project data instantly.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.