BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 23, 2024 at 8:00 PM

Updated May 24, 2024

Site work and paving for a mixed-use development in Richmond Hill, Ontario. Completed plans call for site work for a bridge / tunnel; road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

**As of May 23,2024 project was awarded to Viola Management Inc., awarded amount is $10,987,176.55 ** Work includes, but is not limited to, asphalt removal, warm mix asphalt paving, pavement markings, concrete curb and gutter replacement, culvert replacement, culvert relining, and intersection improvements Location A - Yonge Street (Y.R. 1) from Stouffville Road (Y.R. 14) to 300 m south of Bloomington Road (Y.R. 40) in the City of Richmond Hill Location B - Mulock Drive (Y.R. 74) from Bathurst Street (Y.R. 38) to 60 m west of Yonge Street (Y.R. 1), including 100 m on Bathurst Street south of Mulock Drive, in the Town of Newmarket Location C - Green Lane (Y.R. 19) from 325 m east of Highway 404 to Woodbine Avenue (Y.R. 8) in the Town of East Gwillimbury Bidders are advised that the Work will be performed during the 2024 construction season. Documents can be obtained at https://york.bidsandtenders.ca/ Question Deadline: Wed Apr 10, 2024 5:00:00 PM (EDT) Bid values are undisclosed

Award

Roads / Highways

$10,987,177.00

Public - County

Paving, Site Work

92

9

11

6

Subscribe For Documents

48 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
121
Active Projects
4
Bidding Soon
2,315
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 17, 2024

May 14, 2024

Project location map

Multiple Locations, Richmond Hill, ON

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.